wires into and through the conduit located at the bottom of the transfer switch.  For 6295, after the wire harness conduit has been attached to 
the transfers switch, insert and feed both wires along with the wire harness into and through the conduit located at the bottom of the transfer 
switch. For all models, terminate wires NC1 and NC2 to the load center neutral bus bar. See Figure 2 Wiring Diagrams for all wire routing and 

connections. 

 

FIGURE 1:    

  

Models 

6294-6376-6408 

  Models 6295-6378-6379-6380-6381  

                       

          

  

 

B. Terminate COM1 and COM2 wires: 

1.

 

For 6294 and 6295 models: Locate and strip 5/8” insulation from the 2 -15” gray wires labeled COM1 and COM2 and terminate both to the 

manual transfer switch neutral buss bar.  

C. Terminate NO1, NO2 and RET wires: 

1.

 

Locate and strip 5/8” insulation from the 3-15” gray wires marked NO1, NO2 and RET.  

2.

 

For manual transfer switches without Flanged Inlets, connect these 3 wires with the generator neutral (white) wire coming from the Power Inlet 
Box. 

D. Install insulated terminal block (Item D) in load center: 

1.

 

Identify and disconnect from the load center neutral buss bar all branch circuit neutral (white) wires for the circuits that have been connected to 

the transfer switch.  

2.

 

Locate the provided insulated terminal block close to the load center neutral buss bar and reconnect the branch circuit neutral (white) wires to 
the insulated terminal block removed in Step D1 above.  

3.

 

Connect the neutral (white) wire in the wiring harness coming from the transfer switch to the insulated terminal block 

E. Terminate GEN wire: 

1.

 

Locate and strip 5/8” insulation from the 15” red wire marked GEN. 

2.

 

For 6294 and 6295 models, terminate the red GEN wire along with the generator input wire into one of the GEN circuit breaker lugs in the 
transfer switch. Torque to recommended specification. 

3.

 

Installation is now complete. 
 
 

STEP 3:  USING YOUR TRANSFER SWITCH WITH SWITCHED NEUTRAL KIT: 

The operation of the Switched Neutral Kit inside your transfer switch requires no operator assistance.  Just follow the 
instructions on the transfer switch.  When the transfer switch is in Utility mode, the utility neutral is connected to the circuits 
located in the transfer switch.  When generator power is connected to the transfer switch, the Switched Neutral Kit transfers 

the transfer switch circuits from utility to generator neutral.  When generator power is disconnected, the Switched Neutral Kit 
transfers back to utility neutral.  

 

 
 

 
 