3.3.1 “Y” TYPE TRANSFER SWITCHES

A manual handle was shipped with the transfer
switch. Test manual operation for “Y” type transfer
switches as follows (Figure 3.2):

1.

Check that the generator's Auto/Off/Manual
switch has been set to OFF position.

2.

Attach the square opening of the manual handle
over the square shaft at lower right corner of
transfer mechanism.

3.

Move the manual handle UP. When movement
stops at NEUTRAL, return handle to its original
position and actuate again.

4.

Observe the changeover display on transfer
mechanism as follows:

• If utility arrow is aligned with GREEN band, load

is connected to UTILITY (normal) power source.

• If STANDBY arrow is aligned with GREEN band,

LOAD is connected to STANDBY (emergency)
source.

5.

Repeat steps 3 and 4 several times, being sure the
switch main contacts actuate normally to all posi-
tions.

6.

When certain that switch operates normally, actu-
ate the main contacts to their UTILITY (normal)
source.

NOTE:

LOAD must be connected to UTILITY source
before proceeding. That is, the GREEN BAND
must be next to the UTILITY arrow and the RED
band must be next to the STANDBY arrow.

Figure 3.2 — Manual Operation of “Y” Type

Transfer Switch

3.4

VOLTAGE CHECKS

1.

Turn ON the UTILITY power supply to the trans-
fer switch with whatever means provided (such as
the UTILITY maim line circuit breaker).

PROCEED WITH CAUTION. THE TRANSFER
SWITCH IS NOW ELECTRICALLY HOT. CONTACT
WITH LIVE TERMINALS RESULTS IN EXTREMELY
HAZARDOUS AND POSSIBLY FATAL ELECTRICAL
SHOCK.

2.

With an accurate AC voltmeter, check for correct
voltage across terminal lugs N1 and N2; N1 to
NEUTRAL; and finally N2 to NEUTRAL (Figure
2.5 on Page 5).

3.

When certain that UTILITY supply voltage is correct
and compatible with transfer switch ratings, turn
OFF the UTILITY supply to the transfer switch.

4.

On the generator panel, set the Auto/Off/Manual
switch to MANUAL position. The generator
should crank and start.

5.

Let the generator stabilize and warm up at no-
load for at least five minutes.

6.

Set the generator's main circuit breaker (CBI ) to
its ON or CLOSED position.

PROCEED WITH CAUTION. A GENERATOR OUT-
PUT VOLTAGE IS NOW BEING DELIVERED TO
TRANSFER SWITCH TERMINALS. CONTACT WITH
LIVE TERMINALS RESULTS IN EXTREMELY DAN-
GEROUS AND POSSIBLY FATAL ELECTRICAL
SHOCK.

7.

With an accurate AC voltmeter and frequency
meter, check the no-load, voltage and frequency
meter at transfer switch terminal lugs E1, E2 and
NEUTRAL. Readings should be as follows:

a. Frequency ........................61-63 Hz
b. Terminals E1 and E2

......242-253 volts

c. Terminal E1 to Neutral ....121-126 volts
d. Terminal E2 to Neutral ....121-126 volts

8.

Set the generator's main circuit breaker (CBI ) to
its OFF or OPEN position.

9.

To

shut

down

the

generator,

set

its

Auto/Off/Manual switch to OFF position.

NOTE:

Do NOT proceed until generator AC output voltage
and frequency are correct and within stated limits.
If the no-load voltage is correct but no-load fre-
quency is incorrect, the engine governed speed
probably requires adjustment. If no-load frequen-
cy is correct but voltage is not, the voltage regula-
tor may require adjustment.

DANGER

DANGER

Section 3 — Operation

Generac “V” Type and “Y” Type Transfer Switch

Содержание 09227-0

Страница 1: ...POWER SYSTEMS INC Owner s Manual 100 and 200 Amp V Type and Y Type Transfer Switch Models 09227 0 09228 0 09229 0 and 09230 0 This manual should remain with the unit...

Страница 2: ...f a NORMAL utility power source failure occurs must be isolated from the NORMAL utility power source by means of an approved transfer switch Failure to properly isolate the NORMAL and STANDBY power so...

Страница 3: ...e standing on metal or concrete place insulative mats over a dry wood platform Work on this equipment only while standing on such insulative mats Never work on this equipment while physically or menta...

Страница 4: ...ard signals to open the start circuit to the generator which shuts down the engine The circuit board is then armed and ready for the next drop in NORMAL source voltage NOTE Keep in mind the pre packag...

Страница 5: ...lling Do not drop the switch Protect the switch against impact at all times and against construction grit and metal chips Never install a transfer switch that has been damaged Install the transfer swi...

Страница 6: ...nds with a wire brush If ALUMINUM conductors are used apply cor rosion inhibitor to conductors After tightening ter minal lugs carefully wipe away any excess corrosion inhibitor All power cables shoul...

Страница 7: ...ic Auxiliary contacts are rated 15 amperes at 125 250 or 480 volts AC 0 5 ampere at 125 volts DC 0 25 ampere at 250 volts DC DO NOT EXCEED THE RATED VOLTAGE AND CURRENT OF THE CONTACTS Contact operati...

Страница 8: ...ration DO NOT ATTEMPT MANUAL OPERATION OF THE TRANSFER SWITCH UNTIL AFTER ALL POWER VOLTAGE SUPPLIES TO THE SWITCH HAVE BEEN TURNED OFF FAILURE TO TURN OFF POWER VOLTAGE SUPPLIES MAY RESULT IN DANGER...

Страница 9: ...POSSIBLY FATAL ELECTRICAL SHOCK 2 With an accurate AC voltmeter check for correct voltage across terminal lugs N1 and N2 N1 to NEUTRAL and finally N2 to NEUTRAL Figure 2 5 on Page 5 3 When certain tha...

Страница 10: ...58 Hz Let the generator run under rated load for at least 30 minutes With unit running listen for unusual noises vibration overheating etc that might indicate a problem 5 When checkout under load is c...

Страница 11: ...Generac Power Systems Inc 9 Section 4 Notes Generac V Type and Y Type Transfer Switch...

Страница 12: ...FER SWITCH UTILITY SUPPLY LOAD CUSTOMER 23 LOAD 2 UTILITY 2 UTILITY 1 AC GENERATOR CONTROL PANEL NOTE POWER LEADS AND TRANSFER SWITCH LEADS MUST BE RUN IN TWO DIFFERENT CONDUITS LOAD 1 22 LOAD 1 REMOT...

Страница 13: ...N2 126 E2 T2 E1 LEGEND LS1 LS2 LS3 LIMIT SWITCHES ACTUATOR C CONTACTOR ACTUATING COIL GTS TRANSFER SWITCH CONTACTOR TR RELAY TRANSFER TS TERMINAL STRIP CUSTOMER CONNECTION NOTE ALL CONTACTS SHOWN WITH...

Страница 14: ...E2 E2 205 126 N2 126 WHITE RED LS2 LS3 LS1 T1 T2 2 3 5 6 1 4 2 1 8 7 3 4 5 6 126 205 N2 N2 NI N2 NI NI NI NI E1 194 23 N1A N1A N2 N1 N2 N3 N1 NI NI N1A PM C TR TR GTS TS SCHEMATIC DIAGRAM WIRING DIAGR...

Страница 15: ...SCHEMATIC DIAGRAM GTS TRANSFER SWITCH CONTACTOR C1 SOLENOID COIL UTILITY CLOSING C2 SOLENOID COIL STANDBY CLOSING ALL CONTACTS SHOWN WITH TRANSFER SWITCH IN UTILITY TR 194 NOTE 194 A 23 23 B VR1 C1 A...

Страница 16: ...14 13 33 16 18 20 22 33 32 34 35 19 23 26 33 9 32 17 31 10 12 12 10 37 DECAL DECAL DECAL DECAL 42 21 39 38 40 41 43 24 25 44 Section 6 Exploded Views and Parts Lists Transfer Switch Drawing No 078589...

Страница 17: ...ET 19 64113 1 STUD WING 20 63321 1 HANDLE TRANSFER SWITCH 21 57329 1 LUG GROUND 22 63306 1 MONITOR POWER 3 PHASE 23 61675 1 SOCKET RELAY OCTAL 24 47411 4 M6 1 0 x 16 HHCS 25 22473 4 M6 FLAT WASHER 26...

Страница 18: ...25 15 16 7 12 11 9 26 24 34 47 10 11 12 31 32 30 33 35 22 23 16 21 36 TO RETAIN COVER BOTTOM POWER TERMINALS DECAL A A DECAL A A DECAL 37 40 41 42 43 44 39 DECAL DECAL 45 49 48 46 POWER TERMINAL LUG...

Страница 19: ...DERLESS 23 74138 2 MALE DISCONNECT ADAPTOR BENT 24 77052 2 MALE DISCONNECT ADAPTOR 25 77029 1 DECAL MANUAL OPERATIONS 26 A2595 1 DECAL TERMINAL STRIP 27 81238 1 HARNESS WIRE 28 77032 1 DECAL TRANSFER...

Страница 20: ...ciated part s adjustments loose leaking clamps installation and start up 4 Use of Non Generac replacement part s will void the warranty in its entirety 5 Any failure caused by contaminated fuels oils...

Отзывы: