![Gema OptiSpray AP01.1-E Скачать руководство пользователя страница 21](http://html.mh-extra.com/html/gema/optispray-ap01-1-e/optispray-ap01-1-e_operating-instructions-and-spare-parts-list_2206662021.webp)
Rev. 03 01/21
OptiSpray AP01.1-E
Assembly / Connection
21
Assembly / Connection
Assembly guide
The application pump can be used either in an OptiCenter OC03-E or
OC05-E Powder management center.
fig. 6
ATTENTION
Surrounding temperature too high
– Install the Application pump only in locations with an ambient
temperature of b15 and +40 °C, i.e. never next to heat
sources (such as an enameling furnace) or electromagnetic
sources (such as a control cabinet).
Содержание OptiSpray AP01.1-E
Страница 5: ...Rev 03 01 21 OptiSpray AP01 1 E Table of contents 5 ...
Страница 6: ......
Страница 14: ...Rev 03 01 21 14 Product description OptiSpray AP01 1 E Rating plate fig 2 ...
Страница 20: ...Rev 03 01 21 20 Product description OptiSpray AP01 1 E ...
Страница 24: ...Rev 03 01 21 24 Assembly Connection OptiSpray AP01 1 E ...
Страница 26: ...Rev 03 01 21 26 Start up OptiSpray AP01 1 E ...
Страница 28: ...Rev 03 01 21 28 Operation OptiSpray AP01 1 E ...
Страница 37: ...Rev 03 01 21 OptiSpray AP01 1 E Maintenance Repairs 37 Replacing the solenoid valves 1 2 3 ...
Страница 38: ...Rev 03 01 21 38 Maintenance Repairs OptiSpray AP01 1 E 4 5 6 ...
Страница 39: ...Rev 03 01 21 OptiSpray AP01 1 E Maintenance Repairs 39 7 8 9 The assembly takes place in reverse order a ...
Страница 44: ...Rev 03 01 21 44 Fault clearance OptiSpray AP01 1 E ...
Страница 48: ...Rev 03 01 21 48 Disposal OptiSpray AP01 1 E ...
Страница 58: ......
Страница 61: ......
Страница 62: ...Rev 03 ...