
www.gemu-group.com
19 / 32
GEMÜ GDR/GSR
10 Assembly
After disassembly, the inspection and lubrication of the vari-
ous parts take place in the following assembly sequence:
1. Correct assembly of all parts included in the previously
lubricated ALEDER maintenance kits.
2. Insert the blow-out proof shaft
02
into the actuator hous-
ing
01
from below. Mount the cam
05
in the correct posi-
tion and install the cam spacer ring
06
.
3. Insert the shaft washer
08
, shaft snap ring
09
and insert
indicator in the top part of the pinion.
4. Install the two pistons and make sure that they click in po-
sition at the same time when you turn the blow-out proof
shaft
02
clockwise for normally closed actuators and anti-
clockwise for normally open actuators.
5. Install the end caps
16
and tighten the screws
17
evenly.
6. The open and closed position must be correctly aligned
with the stated position in the top part of the pinion, then
mount the cover.
NOTICE
▶
After installation, operate the actuator a few times.
10 Assembly