Gefen GTV-ETH-2-PLC Скачать руководство пользователя страница 32

29

WARRANTY

Gefen warrants the equipment it manufactures to be free from defects in material 
and workmanship.

If equipment fails because of such defects and Gefen is notifi ed within two (2) 
years from the date of shipment, Gefen will, at its option, repair or replace the 
equipment, provided that the equipment has not been subjected to mechanical, 
electrical, or other abuse or modifi cations. Equipment that fails under conditions 
other than those covered will be repaired at the current price of parts and labor in 
effect at the time of repair. Such repairs are warranted for ninety (90) days from 
the day of reshipment to the Buyer.

This warranty is in lieu of all other warranties expressed or implied, including 
without limitation, any implied warranty or merchantability or fi tness for any 
particular purpose, all of which are expressly disclaimed.

1.  Proof of sale may be required in order to claim warranty.

2.  Customers outside the US are responsible for shipping charges to and from 

Gefen.

3.  Copper cables are limited to a 30 day warranty and cables must be in their 

original condition.

The information in this manual has been carefully checked and is believed to 
be accurate. However, Gefen assumes no responsibility for any inaccuracies 
that may be contained in this manual. In no event will Gefen be liable for 
direct, indirect, special, incidental, or consequential damages resulting from 
any defect or omission in this manual, even if advised of the possibility of such 
damages. The technical information contained herein regarding the features and 
specifi cations is subject to change without notice.

For the latest warranty coverage information, refer to the Warranty and Return 
Policy under the Support section of the Gefen Web site at www.gefen.com.

PRODUCT REGISTRATION

Please register your product online by visiting the Register Product page 

under the Support section of the Gefen Web site.

Содержание GTV-ETH-2-PLC

Страница 1: ...Ethernet Over PLC User Manual www gefentv com GTV ETH 2 PLC...

Страница 2: ...omer Service 20600 Nordhoff St Chatsworth CA 91311 www gefentv com support gefentv com Notice Gefen Inc reserves the right to make changes in the hardware packaging and any accompanying documentation...

Страница 3: ...ptions 6 Receiver Panel Layout 7 Receiver Panel Descriptions 8 GefenTV Ethernet Over PLC Software Installation 11 Connecting The GefenTV Ethernet Over PLC 17 Automatic Security Setup Feature 19 Advanc...

Страница 4: ...ernet Over PLC Send RJ 45 Ethernet signals over power lines in the walls of your home with the GefenTV Ethernet Over Power Line Bridge The Bridge s sender and receiver units send Ethernet through the...

Страница 5: ...nodes must be on the same power phase to communicate properly Multiple receiving nodes can be used on the same in house power line system to extend the network to multiple locations Performance of Ge...

Страница 6: ...e Power Management Features include IGMP multicast VLAN and QOS packet management 3DES 168 bits encryption used for secure operation Four RJ 45 Ethernet ports on Receiver Unit Package Includes 1 Gefen...

Страница 7: ...4 Top Panel 5 6 7 4 Back Panel 1 2 3 Front Panel SENDER PANEL LAYOUT...

Страница 8: ...nfiguration please see page 17 Pressing this button for more than 10 seconds will perform a factory reset 4 AC Power Cable Input Input for the supplied AC power cable 5 LAN LED This LED will activate...

Страница 9: ...6 Front Panel Back Panel Top Panel 1 4 2 3 5 6 7 8 9 10 RECEIVER PANEL LAYOUT...

Страница 10: ...a is actively being trafficked to and from this port 6 LAN 2 LED This LED will activate when a connection from a valid Ethernet device to Ethernet port 2 is established It will blink when activity is...

Страница 11: ...2 The auto run will begin the installation process If auto run does not start or auto run has been disabled please navigate to X drive where X is the drive letter or your CD ROM drive and run the auto...

Страница 12: ...9 GEFENTV ETHERNET OVER PLC SOFTWARE INSTALLATION 5 Close all other applications and press the Next button to continue 6 Please read the license agreement and click on the I Agree button to continue...

Страница 13: ...tton to change the installation location 8 The program files will copy to the specified location in the previous step When the process is complete you will see the window below Click on the finish but...

Страница 14: ...h a solid blue color LAN LED When a valid Ethernet connection is detected on the sending and receiving Ethernet jacks their corresponding LED s will become active and should emit a solid blue color LI...

Страница 15: ...rformed Automatic configuration is also possible using the Automatic Security Configuration feature on page 17 in lieu of the procedure outlined in this section 1 Ensure that both the local and remote...

Страница 16: ...des must use the same Net ID and encryption passwords for proper operation These will be configured in the next step However it is important to configure the remote nodes first If the local node is co...

Страница 17: ...I string up to 24 characters long ALIAS This name is for easy identification of the node This can be an ASCII string of up to 10 characters long This field is optional NEW PASSWORD CONFIGURATION PASSW...

Страница 18: ...ote node is complete you will be presented with a window that will give the option to either return to the main configuration window or continue with advanced configuration For basic usage it will not...

Страница 19: ...ds for the local node The Alias field should be set to a different name as the remote node for easy identification Once the information has been input click on the next button to continue A confirmati...

Страница 20: ...figuration Mode ASCM This mode is initialized by pressing and holding the Security Reset button on the front panel for approximately 2 seconds Once the node s Power LED begins flashing RED release the...

Страница 21: ...lave nodes have to be in ASCM To do this press and hold the Security Reset button on the Master node for approximately 2 seconds The Power LED should begin flashing RED Within 30 seconds press and hol...

Страница 22: ...on the MAC address of the node you wish to configure and click on the advanced button to the left of the node listing General Hardware Reset This will reboot the node Settings made in this menu will b...

Страница 23: ...firmware from a file Please see the Firmware Update section on page 27 for full details Network IP Configuration For access to the node s web configuration tool an IP address must be assigned Options...

Страница 24: ...disable the node s ability to transmit IGMP multicast data Security The security tab will allow the user to adjust the configuration password the encryption password the network ID and the alias for t...

Страница 25: ...a If this feature is enabled on one of the nodes it must be set on all other for VLAN tag packets to pass QOS QOS Quality Of Service is supported for managing traffic between nodes The supported proto...

Страница 26: ...1 UDP is high priority TCP is low priority 2 TCP is high priority UDP is low priority 3 UDP port XXXX is high priority the rest is low priority 4 UDP port XXXX is low priority the rest is high priorit...

Страница 27: ...ned on page 20 The IP address can either be assigned by the DHCP server or a static IP address can be manually assigned Authentication The browser should open the authentication page displayed below A...

Страница 28: ...ith all the current configuration information see page 26 Clicking on the change configuration link will navigate to a new page where all configuration options will be available for adjustment see bel...

Страница 29: ...y clicking on any of the Return to main page links FURTHER INFORMATION This page will display all of the information and status of the current node The following sections are listed System Information...

Страница 30: ...server IP address 3 Enter the user name and password 4 Enter the name of the file if the file is not in the root directory of the TFTP or FTP directory you have to write the whole route from root ser...

Страница 31: ...n Power AC 100 240V 50 60Hz 0 15A Power Consumption 8W 230V Max 7W 110V Max Operating Temp 0 40 C 32 104 F Operating Humidity 10 90 non condensing Storage Temp Range 20 70 C 4 158 F Storage Humidity 5...

Страница 32: ...Proof of sale may be required in order to claim warranty 2 Customers outside the US are responsible for shipping charges to and from Gefen 3 Copper cables are limited to a 30 day warranty and cables...

Страница 33: ...Rev X4 MA GTV ETH 2 PLC Pb 20600 Nordhoff St Chatsworth CA 91311 1 800 545 6900 818 772 9100 fax 818 772 9120 www gefen com support gefen com This product uses UL listed power supplies...

Отзывы: