
GEEETECH
www.geeetech.com
Tel: +86 755 2658 4110 Fax: +86 755 2658 4074 – 858
Page
54
ShenZhen GETECH CO.,LTD
M3 washer
#5
6
Step 1.
Thread the timing belt (#36) through the drive wheel with the pitched side
in direct contact with the drive wheel and the smooth side facing out.
Step 2. Punch a 2-2.5mm hole in to the timing belt (#36) with a leather hole punch or
similar (not supplied).
Step 3. Fix one end of the timing belt (#36) to the belt mount (#M5) with a M3x8mm
screw (#18) and M3 washer (#5).
Step 4. Guide the timing belt (#36) around the motor pulley (#34) and back up to the
underside of the belt mount (#M5). Mark the location of the new hole to be punched
to allow the timing belt (#36) to be fixed to the belt mount (#M5). Trim the timing
belt (#36), punch the hole and fix it to the belt mount (#M5) with a M3x8mm screw
(#18) and M3 washer (#5).
Содержание Delta Rostock mini G2 pro
Страница 1: ...Geeetech Delta Rostock mini G2 pro G2s pro Building Instruction Document version 04 11 2016 ...
Страница 32: ...GEEETECH www geeetech com Tel 86 755 2658 4110 Fax 86 755 2658 4074 858 Page 30 ShenZhen GETECH CO LTD ...
Страница 50: ...GEEETECH www geeetech com Tel 86 755 2658 4110 Fax 86 755 2658 4074 858 Page 48 ShenZhen GETECH CO LTD Videos ...
Страница 53: ...GEEETECH www geeetech com Tel 86 755 2658 4110 Fax 86 755 2658 4074 858 Page 51 ShenZhen GETECH CO LTD ...
Страница 87: ...GEEETECH www geeetech com Tel 86 755 2658 4110 Fax 86 755 2658 4074 858 Page 85 ShenZhen GETECH CO LTD ...