GEDA
®
Temporary Construction Hoist PH 650
Operating Manual
Page 16 of 64
BL148GB2017 / 11
4.8
Hoist hazards
The hoists have been designed and manufactured according to the current
state of the art. They have been subjected to a safety inspection and
acceptance procedure before delivery.
Nevertheless, personal hazards or material damage may result if operated
incorrectly, used improperly, used without due care and attention,
insufficiently serviced or if components fail.
4.9
Hazard sources/existing residual hazards
As with all complex machinery, GEDA hoists also represent a source of
potential hazards. These are:
Moving, rotating, pointed and sharp-edged parts
•
Drives
•
Chains/ropes/cables
Energies
•
Electricity
•
Hot surfaces
•
Potential energy (raised components / tipping/falling loads / falling
tools)
Operating materials
•
Oils
•
Greases
Emergency
•
Defect during installation/operation of the hoist with persons inside
the car.
4.10
Other relevant documents
In addition to this manual, the following documents must be observed by
the corresponding target group:
•
the instructions for the landing level safety doors, as necessary.
•
Relevant customer service information, if applicable
•
The manuals from suppliers of purchased parts
•
Installation drawings/diagrams.
These documents must be supplemented by the operating company with
the national regulations of the country of use applicable in each case. If the
hoist is sold or passed on, the documentation must be passed on as well.
Содержание PH 650
Страница 1: ...Original operating manual Operating Manual Car PH 2032 PH 2737 PH 3240 Single Twin...
Страница 2: ......
Страница 3: ...GEDA Temporary Construction Hoist PH 650 Operating Manual Page 3 of 64 BL148GB2017 11...
Страница 4: ...GEDA Temporary Construction Hoist PH 650 Operating Manual Page 4 of 64 BL148GB2017 11...
Страница 8: ...GEDA Temporary Construction Hoist PH 650 Operating Manual Page 8 of 64 BL148GB2017 11...
Страница 63: ......