
MC-MP-SBD O wner’s Manual
18
Standard floor
installation
procedure
The MC-MP-SBD provides for versatile installation: brackets
allow wall installation and special mounting foot floor
installation. In both cases a special plastic guide plate facilitates
installation.
Power Box
Installation
1•
Select most appropriate
location on floor for
spa pack and firmly
attach guide plate to
wooden base with
3 standard screws.
2•
Slide back side of the
unit's mounting foot
into guide plate. It
should slide into place
easily.
3•
N ow firmly attach unit
to wooden base by
using two screws to fix
the front side of the
foot.
Содержание M-CLASS MC-MP-SBD
Страница 7: ...Notes...
Страница 27: ...MC MP SBD Owner s Manual 26 Notes...
Страница 29: ...MC MP SBD Owner s Manual 28 Notes...
Страница 31: ...MC MP SBD Owner s Manual 30 Notes...
Страница 41: ...MC MP SBD Owner s Manual 40 Notes...
Страница 45: ...MC MP SBD Owner s Manual 44 Notes...