2.7

 

Detaching the hauling frame – the 
height-adjustable accumulator models 

With  regard  to  1,000-litre  accumulators,  our  product  range 
includes models whose height can be reduced. In such models, 
the steel framework beneath the accumulator has two parts. The 
lower part of the framework, the one facilitating hauling, can be 
detached at the installation site, thereby reducing the height of 
the accumulator by 150mm.  

Lift  the  accumulator  up  from  the  hoist  ring,  or,  alternatively, 
remove  the  insulation  (see  the  previous  page  for  instructions) 
and carefully turn the accumulator onto its side. 

 

1. Detach the lower framework by loosening the bolts. 

 

2. Detach the lower framework.  

 

3. Detach the levelling feet from the lower framework.  

 

4. Screw the legs into place on the framework that was left on 
the bottom of the accumulator. 

NOTE:

  The  connection  on  the  bottom  of  the  model  with  a 

reduced height is no longer available. The connection is ready-
plugged on delivery

 

 

 

Содержание G-Energy

Страница 1: ...Installation operation and maintenance manual G Energy...

Страница 2: ...e 4 1 and 4 3 of the Pressure Equipment Directive 2014 68 EU in order to ensure their safe operation KEEP THE OPERATION INSTRUCTIONS IN THE IMMEDIATE VICINITY OF THE DEVICE You should familiarise your...

Страница 3: ...damage the device and weaken the efficiency of the device Please bear in mind that a visit by a retailer or service technician is not free even during the warranty period if the repair is done due to...

Страница 4: ...llation operation and maintenance manual and consider whether you have followed the manual when using the device ensure before making the request that the warranty period has not run out you have care...

Страница 5: ...hed to each other with quick latches which makes it easy to remove or install them The accumulator s connections do not reside inside the insulation to facilitate pipe installations the connections ex...

Страница 6: ...d lifting the device in an oblique direction is prohibited If the accumulator is transported to its site of installation lying on its side the length of the accumulator in this position must be taken...

Страница 7: ...ucing the height of the accumulator by 150mm Lift the accumulator up from the hoist ring or alternatively remove the insulation see the previous page for instructions and carefully turn the accumulato...

Страница 8: ...ed at the bottom part of the accumulator with the size of the connection being 1 4 2 Filling The accumulator should be filled with water that is as warm as possible in order to facilitate bleeding and...

Страница 9: ...e box to the fastening screw 4 Thread the metal installation ring of the box over the heaters connectors Fasten the bottom of the box using hexagon socket head screws ensuring that the installation ri...

Страница 10: ...allation and use The load exerted by a filled accumulator on the floor including any need to reinforce the floor Any risks posed by the fluid in the system in connection with installation use and main...

Страница 11: ...ollowing inspections have been carried out V Hot water Notes shut off valves mixing valve Cold water shut off valves mixing valve safety valve Electricity connected power supply sensors temperature li...

Страница 12: ...l depending on the model depending on the model depending on the model depending on the model depending on the model Connection sizes as desired as desired as desired as desired as desired as desired...

Отзывы: