Gear4music Seattle Скачать руководство пользователя страница 4

Step

 

2

 

 

 

 

Solder

 

the

 

red

 

Earth

 

Wire

 

to

 

the

 

back

 

of

 

the

 

Volume

 

Pot

 

(8),

 

and

 

feed

 

through

 

the

 

hole

 

in

 

the

 

body

 

cavity

 

to

 

the

 

Bridge

 

Pin

 

holes

 

as

 

pictured.

 

 

Attach

 

the

 

wiring

 

to

 

the

 

Scratchplate

 

(6).

 

The

 

Jack

 

Input

 

(9)

 

should

 

be

 

secured

 

using

 

the

 

Washer

 

and

 

Nut

 

(11),

 

and

 

the

 

Tone

 

Pots

 

should

 

be

 

secured

 

using

 

the

 

Pot

 

Nuts

 

and

 

Washers

 

(12).

 

The

 

Scratchplate

 

(6)

 

should

 

then

 

be

 

attached

 

to

 

the

 

body

 

(1)

 

using

 

the

 

10

 

x

 

12mm

 

screws,

 

lining

 

them

 

up

 

with

 

the

 

pilot

 

holes.

 

 

Place

 

the

 

pickups

 

in

 

the

 

correct

 

positions

 

as

 

pictured.

 

Put

 

the

 

4

 

x

 

45mm

 

screws

 

through

 

the

 

holes

 

in

 

the

 

Pickups

 

(4

 

and

 

5).

 

Place

 

the

 

4

 

screw

 

on

 

the

 

screws

 

underneath

 

the

 

pickups,

 

and

 

then

 

screw

 

the

 

pickups

 

into

 

place.

 

 
 
 
 

Содержание Seattle

Страница 1: ...oping Saw or Jigsaw and then finishing off with sandpaper We have not supplied full instructions for this as the process will depend on your individual design Again an internet search engine search wi...

Страница 2: ...7 Tone Pot 8 Volume Pot 9 Output Jack 10 Transistor 11 Jack Washer 12 Pot Nuts 13 Tailpiece 14 Bridge Pins 15 Bridge 16 Machine Heads 17 Ferrules 18 Washers 19 Neck Plate 20 Control Knobs 21 Strings...

Страница 3: ...of the long cable pair to the first arm of the Volume Pot 8 The Grey cable of the long cable pair should be soldered to the back of the Volume Pot 8 The Green wire should be soldered from the second a...

Страница 4: ...the Washer and Nut 11 and the Tone Pots should be secured using the Pot Nuts and Washers 12 The Scratchplate 6 should then be attached to the body 1 using the 10 x 12mm screws lining them up with the...

Страница 5: ...Step 3 Screw the Tailpiece 13 in place aligning it with the pilot holes using the 7 x 25mm screws Put the Bridge Pins 14 in the holes as pictured...

Страница 6: ...Step 4 Put the Body 1 and Neck 2 together Place the Neck Plate 19 with the rubber Pad on the back of the Body 1 in line with the pilot holes and attach with the 4 x 45mm screws...

Страница 7: ...then be turned over and the 6 x 10mm screws should be screwed in to the pilot holes securing the machine heads in place String the guitar and then attach the String Trees to the Headstock using the 8...

Страница 8: ...rap Buttons with their rubber washers to the pilot holes on the base and arm of the body using the 2 x 25mm screws Place the Bridge 15 on top of the Bridge Pins 14 and then string the guitar using the...

Страница 9: ...Congratulations you have now completed the construction of your guitar...

Страница 10: ...Appendix Wiring Diagram...

Отзывы: