FINAL SETUP
Installation Instructions
LEVEL THE DRYER
Stand the dryer upright near the final location and
adjust the four leveling legs at the corners to ensure
that the dryer is level from side to side and front to
rear.
Lower
Raise
PLUG DRYER IN
Ensure proper
ground exists
before use.
1
2
DRYER START-UP
Press the
Power
button.
NOTE:
If the dryer has been exposed to
temperatures below freezing for an extended
period of time, allow it to warm up before pressing
Power
. Otherwise, the display will not come on.
The dryer is now ready for use.
3
32
Содержание GFD48
Страница 3: ...3 Notes GEAppliances com ...
Страница 41: ...41 Notes ...
Страница 51: ...Notes www electromenagersge ca 3 ...
Страница 89: ...Notes 41 ...
Страница 95: ...47 Notes www electromenagersge ca ...
Страница 99: ...Notas GEAppliances com 3 ...
Страница 137: ...Notas GEAppliances com 41 ...
Страница 143: ...Notes GEAppliances com 47 ...