Depending on the cleaning method (medium, concentration, temperature and
contact times), the seals are affected to different degrees. This can impair the
function and the service life.
In order to meet the EHEDG requirements and to guarantee correct cleaning of
the valve, the recommended cleaning pressure is between 1 - 5 bar with a flow
speed of ≥ 1.5 m/s.
With several inlets and outlets, like for the housing combinations A, E and C,
separated flows are to be avoided, since this would lead to lower flow speeds.
We therefore recommend to clean the upper and lower pipelines separately and
then clean the valve disk.
9.2
Passivation
Before commissioning an installation, passivation is usually carried out for long
pipes and vessels.
Valve blocks are usually excepted from this. Passivation is typically performed
using nitric acid (HNO
3
) at approx. 80 °C (176 °F) at a concentration of 3 % and a
contact time of 6 to 8 hours.
Hint!
TEFASEP® gold valve seat seals achieve optimum sealing only after
an initial CIP or SIP cleaning Operating conditions CIP or SIP cleaning:
- Medium: Lye, hot water or saturated steam
- Temperature: >80 °C (176 °F)
- Holding time: 20 … 30 min
The valve must be brought to the closed position for a brief period (3
minutes) immediately after CIP or SIP cleaning. During
commissioning, regularly check all sealing points for leaks. Exchange
defective seals and repeat the CIP or SIP process.
Cleaning
Passivation
430BAL008302EN_10
36
16.03.2023
Содержание VARIVENT N
Страница 62: ...13 Parts list shut off valve N Fig 43 Fig 44 Parts list shut off valve N 430BAL008302EN_10 62 16 03 2023...
Страница 70: ...14 Parts list shut off valve N_V Fig 45 Fig 46 Parts list shut off valve N_V 430BAL008302EN_10 70 16 03 2023...
Страница 75: ...15 Parts list shut off valve U Fig 47 Parts list shut off valve U 430BAL008302EN_10 16 03 2023 75...
Страница 76: ...Fig 48 Parts list shut off valve U 430BAL008302EN_10 76 16 03 2023...
Страница 83: ...16 Parts list shut off valve U_V Fig 49 Fig 50 Parts list shut off valve U_V 430BAL008302EN_10 16 03 2023 83...
Страница 86: ...17 Parts list shut off valve U_R Fig 51 Parts list shut off valve U_R 430BAL008302EN_10 86 16 03 2023...
Страница 87: ...Fig 52 Parts list shut off valve U_R 430BAL008302EN_10 16 03 2023 87...
Страница 94: ...18 Dimension sheet shut off valve N Fig 53 Dimension sheet shut off valve N 430BAL008302EN_10 94 16 03 2023...
Страница 96: ...19 Dimension sheet shut off valve U Fig 54 Dimension sheet shut off valve U 430BAL008302EN_10 96 16 03 2023...
Страница 103: ...Appendix 430BAL008302EN_10 16 03 2023 103...
Страница 104: ......