
D
GB
F
E
13
96032-04.2015-DGbF
4
|
Compressor assembly
Valve spindle seal
release
tighten
4.9 Operating the shut-off valves
Before opening or closing the shut-off valve, release the valve spindle seal by approx. ¼ of a turn
counter-clockwise.
After activating the shut-off valve, re-tighten the adjustable valve spindle seal clockwise.
Fig. 18
Fig. 19
4.8 Laying suction and pressure lines
A rule of thumb:
Always lay the first pipe section starting from the shut-off valve
downwards and
parallel to the drive shaft.
ATTENTION Property damage possible.
Improperly installed pipes can cause cracks and tears which can
result in a loss of refrigerant.
INFO
Proper layout of the suction and pressure lines directly after
the compressor is integral to the smooth running and vibration
behaviour of the system.
Fig. 17
As short as
possible
Rigid fixed
point