D
GB
F
E
13
09791-08.2011-DGbFEI
5
|
Electrical connection
5 Electrical connection
DANGER! High voltage! Risk of electric shock! Only carry out work when the
electrical system is disconnected from the power supply!
INFO!
Connect the compressor motor in accordance with the circuit diagram
(see inside of terminal box).
Use suitable cable entry point of the correct protection type
(see name plate) for routing cables into the terminal box.
Insert the strain reliefs and prevent chafe marks on the cables.
Compare the voltage and frequency values with the data for the mains
power supply.
Only connect the motor if these values are the same.
5.2 Standard motor, design for direct or partial winding start
Designation on the name plate
Sticker on the terminal box
Y/YY
Compressors with this marking are suitable for direct or partial winding start. The motor winding is
subdivided into two parts: Partial winding 1 = 66% and part winding 2 = 33%. This winding division
reduces the start-up current needed for a part winding start to approx. 65% of that for a direct start.
INFO!
A mechanical unloaded start with bypass solenoid valve is
not required.
5.1 Information for contactor and motor contactor selection
All protection equipment, switching and monitoring devices must comply with the local safety regula
-
tions and established specifications (e.g. VDE) and regulations as well as the manufacturer’s specifica
-
tions.
Motor protection switch is required!
Motor contactors, feed lines, fuses and motor protection
switches must be rated according to the maximum operating current (see name plate). Set the short
circuit trigger current at max. 7 times the permissible operating current according to the compressor
name plate.