15
09665
-01
.2
01
9-
Gb
7 I Installation of service kits
Disassembly and assembly of the compressor
Important Notes
For changing components in the framework of customary service works we recommend the kits described on the following pages.
INFO
Use only new gaskets for assembly
The following illustrations show a FK40 compressor in standard design.
Components of other designs can differ from these illustrations.
However, the procedure for disassembly and assembly of the compressor is identical.
WARNING Before starting any work on the compressor:
• Switch of the compressor and guard it against switching on
• Close the discharge and suction shut-off valves
• Relieve the compressor from system pressure
• Prevent air from infiltrating the system
• Move and transport the compressor using an appropriate hoist
• Use only genuine GEA Bock spare parts
After the work is finished:
• Connect the safety switch and check its function
• Evacuate the compressor
• Before commissioning, check whether all the components installed by the user have been
mounted expertly and are connected pressure-tight to the compressor
• Open the pressure and suction shut-off valves
• Set off the switching-on lock