49-5000561 Rev. 1
INST
ALLA
TION INSTRUCTIONS
Installing the Zoneline
4. Complete Condensate Drain
Connections
$QH[WHUQDORUDQLQWHUQDOGUDLQPXVWEHDWWDFKHGWR
the primary drain connector. A secondary drain is
supplied if required by state and local codes. Refer
to the local codes for proper installation of the drains.
,IWKHVHFRQGDU\GUDLQLVQRWXVHGVHDOLWVGUDLQSRUW
ZLWKD´)137SOXJ
Drain Overview
Internal Drain (Primary)
Secondary Drain
,IQRWXVHGVHDOZLWK
Dñ»´)137SOXJ
Primary Drain
Run condensate line to
building interior drain
line with proper venting
according to local
building codes.
Drain line connection
to right of platform
4. Complete Condensate Drain
Connections (cont)
External Drain (Secondary)
Refer to drain platform instruction
manual for drain installation
,IQHFHVVDU\H[WHQG
secondary drain line though
the plenum and grille.
Use a pipe connector and
additional piping to ensure
GUDLQSLSHH[WHQGVSDVWWKH
outdoor grille.
([WHQGVHFRQGDU\
drain pipe into plenum
or through outdoor
grille. Grille must be
modified to allow drain
line to pass through.
Primary
Drain
5. Install Unit to Plenum
Align the unit with plenum opening and slide unit
toward plenum to ensure it is seated properly with the
drain platform.
Unit
Wall
Plenum
Drain
Platform