Section 7-7 - Hardware Tests
Section 7-7
Hardware Tests
1.) Press F2 key on the control panel.
2.) In the F2 menu, press SYSTEM SETUP button to invoke the setup desktop on the sceen.
3.) If not already done, connect the USB “standard GE” service dongle to the USB connector(s) on the
system. As soon as the dongle is detected, the login window pops up.
4.) Enter the "Standard GE Revolving" password (changes every six months) and the click ENABLE.
5.) On the left side of the screen, select ADMINISTRATION and then click the SERVICE tab.
6.) Click the SERVICE TOOLS button on the Service window to get access to the "Service Tools" page.
7.) Click the HARDWARE TEST button.
8.) Confirm the displayed "Warning" message with OK button.
NOTE:
The "System Diagnostics Tool"(see:
) appears on the screen.
Figure 7-28 Service Tool Page
Figure 7-29 Confirm ‘Warning” Message