Section 7-5 - Monitoring Tests
5.) At any stage, trackball to the
Pause
button and press
Set
, if required.
6.) To resume testing (from the point where you paused), trackball to the
Start
button and press
Set
.
When the Fans Speed Test sequence is complete:
-
the
Diagnostic
Test
window displays the Finished message
-
the View Test Log window opens automatically, listing all tests performed and showing details
of which tests passed or failed, as shown in the example in
.
NOTE:
For this test, there is one report (Fans Status) which is listed in the Reports window on the right.
By default, this report is displayed in the Reports window below.
7.) Check that the test passed and that result values for each fan are within the pre-defined
Max
and
Min
limits, as shown in
.
8) When done, trackball to the
Exit
button and press
Set
to close the View Report window.
9) After reviewing the test results, proceed as follows:
•
If no problems were identified, it is recommended to re-boot the system (this is obligatory when
prompted).
•
If the test passed but the original problem persists, contact your local On-Line Center for
assistance.
•
If the test fails, repeat the Fan Speed Test.
•
If errors were identified but the results were very close to the upper or lower limits, perform
calibration, as described in
"DC Offset Calibration" on page 7-25
, and then repeat the test.
•
If errors were identified (results exceeding acceptable upper or lower limits), verify that all
system cables and boards are connected (not misplaced) and functioning properly, as
described in
Components and Function (Theory)
Figure 7-69 View Test Log - Fans Speed Test
Содержание Vivid q N
Страница 2: ......
Страница 10: ...GE DIRECTION FQ091019 REVISION 2 VIVID Q N SERVICE MANUAL viii 3 SEP 2015 FRONTMATTER FM P R E L I M I N A R Y...
Страница 11: ...GE DIRECTION FQ091019 REVISION 2 VIVID Q N SERVICE MANUAL ix 3 SEP 2015 FRONTMATTER FM P R E L I M I N A R Y...
Страница 12: ...GE DIRECTION FQ091019 REVISION 2 VIVID Q N SERVICE MANUAL x 3 SEP 2015 FRONTMATTER FM P R E L I M I N A R Y...
Страница 13: ...GE DIRECTION FQ091019 REVISION 2 VIVID Q N SERVICE MANUAL xi 3 SEP 2015 FRONTMATTER FM P R E L I M I N A R Y...
Страница 14: ...GE DIRECTION FQ091019 REVISION 2 VIVID Q N SERVICE MANUAL xii 3 SEP 2015 FRONTMATTER FM P R E L I M I N A R Y...
Страница 348: ...GE DIRECTION FQ091019 REVISION 2 VIVID Q N SERVICE MANUAL 6 4 Figure 6 6 Identifying Monitor Type...
Страница 697: ......
Страница 698: ...2013 and 2015 General Electric Company GE Vingmed Ultrasound AS P O Box 141 N 3191 HORTEN NORWAY www gehealthcare com...