49-2000742 Rev. 0
9
INST
ALLA
TION INSTRUCTIONS
Installation Preparation
TOOLS AND MATERIALS REQUIRED
(NOT SUPPLIED)
Gather the required tools and parts before starting
installation. Read and follow the instructions
provided with any tools listed here.
Tools needed
• Level
• Drill with 1-1/4” (3.0 cm), 1/8” (3.2 mm), and 5/16”
(7.9 mm) drill bits
• Pencil
• Wire stripper or utility knife
• Tape measure or ruler
• Pliers
• Caulking gun and weatherproof caulking
compound
• Vent clamps
• Jigsaw or keyhole saw
• Flat-blade screwdriver
• Metal snips
• Phillips screwdriver
• Metric hex key set
For non-vented (recirculating) installations, you will
also need:
• 6” (15.2 cm) dia. round metal vent duct - length
required is determined by ceiling height.
PARTS SUPPLIED
Remove parts from packages. Check that all parts
are included.
• 120 V power cord with 3 prong plug
• Hood canopy assembly with blower, vent
transition, light bulb and canopy glass already
installed
• Metal grease filter
• Vent cover support bracket
• Mounting template
• 2-piece vent cover
• 4 - 4 x 8 screws
• 6 - 5 x 45 mm mounting screws
• 2 - 8 x 40 mm wall anchors
• 4 - 10 x 50 mm wall anchors
Содержание UVW7241SNSS
Страница 15: ...49 2000742 Rev 0 15 Notes ...
Страница 31: ...49 2000742 Rev 0 15 Notas ...