GE Multilin
C70 Capacitor Bank Protection and Control System
10-21
10 APPLICATION OF SETTINGS
10.4 SETTING EXAMPLE
10
10.4.9 BANK OVERCURRENT PROTECTION
Bank overcurrent protection is required to protect capacitor banks against major faults, such as line-to-line or line-to-ground
faults. It is desirable to set overcurrent protection to be as low and as fast as possible, with only enough delay to avoid trip-
ping on external system disturbances.
During bank energization, the capacitor charge current inrush may cause significant neutral currents approaching the bank
phase current levels. Also, during a system SLG fault, unbalanced bank neutral currents can be as high as bank phase cur-
rents. Because of these considerations, the neutral time overcurrent pickup is programmed equal to the phase time over-
current pickup and is set to 1.25 pu. The delay for these elements should be specified longer than the maximum system
fault clearing time (for example 0.5 second).
The phase instantaneous overcurrent element can be set to a value three to four times the capacitor bank rated current to
override back-to-back bank switching.
Negative-sequence instantaneous overcurrent protection is required to provide backup protection for phase current unbal-
ance during rack faults in the banks where phase capacitors are not well separated. Programming the negative-sequence
instantaneous overcurrent pickup at 10% of the nominal bank phase current with a delay of 250 to 400 ms typically pro-
vides adequate coordination for faults external to the bank and protection for internal rack faults.
Содержание UR Series C70
Страница 2: ......
Страница 10: ...x C70 Capacitor Bank Protection and Control System GE Multilin TABLE OF CONTENTS ...
Страница 30: ...1 20 C70 Capacitor Bank Protection and Control System GE Multilin 1 5 USING THE RELAY 1 GETTING STARTED 1 ...
Страница 124: ...4 30 C70 Capacitor Bank Protection and Control System GE Multilin 4 3 FACEPLATE INTERFACE 4 HUMAN INTERFACES 4 ...
Страница 344: ...5 220 C70 Capacitor Bank Protection and Control System GE Multilin 5 10 TESTING 5 SETTINGS 5 ...
Страница 396: ...8 18 C70 Capacitor Bank Protection and Control System GE Multilin 8 3 ENERVISTA SECURITY MANAGEMENT SYSTEM 8 SECURITY 8 ...
Страница 414: ...9 18 C70 Capacitor Bank Protection and Control System GE Multilin 9 1 OVERVIEW 9 THEORY OF OPERATION 9 ...
Страница 436: ...10 22 C70 Capacitor Bank Protection and Control System GE Multilin 10 4 SETTING EXAMPLE 10 APPLICATION OF SETTINGS 10 ...
Страница 547: ...GE Multilin C70 Capacitor Bank Protection and Control System B 79 APPENDIX B B 4 MEMORY MAPPING B ...
Страница 548: ...B 80 C70 Capacitor Bank Protection and Control System GE Multilin B 4 MEMORY MAPPING APPENDIXB B ...
Страница 586: ...D 10 C70 Capacitor Bank Protection and Control System GE Multilin D 1 OVERVIEW APPENDIXD D ...
Страница 598: ...E 12 C70 Capacitor Bank Protection and Control System GE Multilin E 2 DNP POINT LISTS APPENDIXE E ...