TVRMS2 Digital Test Kit
Chapter 4. Power+™, RMS-9, and Epic Trip Units
8
4–1 Test Structure (Power+™, RMS-9,
and Epic)
Figure 10 shows the test-selection structure for Power+,
RMS-9, and Epic Trip Units. Each test sequence is
described in detail below.
Selecting
FUNCTION
from the main menu displays the
function test menu:
.
.
.
..
. .
.
.
. .
.. .. .
. ..... ..
. .
.
Press F1 or F3 (F4 to EXIT)
|– TESTS –| |–SETTNGS-|– EXIT –|
Function test menu.
Press
SETTNGS
(
F3
) to enter the switch settings test mode
(described in the Switch Settings Test section),
EXIT
(
F4
)
to return to the main menu, or
TESTS
(
F1
) to display the
Trip Unit tests menu:
.
.
.
..
. .
.
.
. .
.. .. .
. ..... ..
. .
...
Press F1 or F3 (F4 to EXIT)
|TRIP TEST| |SELF TEST|– EXIT –|
Trip Units tests menu.
Trip Test mode is described in section
4-5 Overcurrent
Simulation
and Self-Test is described in section
4-4 Self-Test
Report
. Press
EXIT
(
F4
) to return to the function test menu.
Test Selection
High-Current
Tests
Quick
Test
Function
Tests
Trip
Breaker
GF Defeat
and Monitor
Settings
Tests
X
C
LT
ST
GF
Inst
Overcurrent
Tests
Trip
Tests
No-Trip
Tests
LT
ST
GF
LT
ST
GF
Self-
Tests
Trip Unit
Status Report
Figure 10. Test-selection structure for Power+™, RMS-9, and Epic Trip Units.