![GE TransPort Скачать руководство пользователя страница 6](http://html.mh-extra.com/html/ge/transport/transport_quick-start-manual_128484006.webp)
TransPort
®
PT900 Quick-Start Guide
4
4.0
Unpacking the PT900 System
Before removing the PT900 system from its carrying case (see the optional hard
shell carrying case in
Figure 1 on page 5
), inspect the contents of the case carefully.
Before discarding any of the packing materials, account for all components and
documentation listed on the packing slip. If anything is missing or damaged,
contact
GE Customer Care
immediately for assistance.
Because the PT900 system may be ordered in many different configurations, the
following packing list is shown only as a typical example:
In addition to the standard components, the following optional components are
available for use with the PT900 system:
•
Energy kit with an RTD module and an RTD cable for connection to the
PT900 transmitter
•
An AIO cable with cabling box
•
A DIO cable with cabling box
•
A battery charger
•
A transducer extension cable up to 100 ft long
•
A 48" chain for the clamp-on fixture
1. Transducers (2)
9. PT900 Power Supply
2. Clamping Fixture
10. OD Tape
3. Transducer Cables
11. Couplant
4. Transmitter
12. PT900 Mounting Strap w/Magnet
5. Tablet
13. Temperature Transmitter
6. Tablet Power Cord
14. Thickness Gauge
7. SD Card
15. Documentation
8. Case