Chapter 4. Inserting T17 Transducers into the Pipe
4.2.3 Aligning the Downstream Transducer (cont.)
4.
Before proceeding, verify that the valve and insertion mechanism are fully bolted in place (see
below). Each stud should extend far enough beyond its nut to allow the alignment tool to rest on the stud. Fit
the alignment fixture over the nozzle studs so that the two studs straddling the centerline on the nozzle are
inserted into the holes on the fixture of the corresponding flange size and rating (3”, 150# or 300#).
Figure 77: Verifying the Transducer Alignment
5.
Adjust the leveling wheel so that the bubble in the level is centered between the two tick marks on the vial.
Figure 78: Bubble Level
6.
Remove the alignment fixture from nozzle studs.
7.
Place two sets of studs, washers and nuts into the flange at the top of barrel assembly, straddling the alignment
mark. Nuts and washers should not be installed on the side of the flange with the serrated raised face.
Extended Range Downstream
Transducer Alignment Tool Placed Over 2 Nozzle/Valve Studs
Alignment Tool Leveling Wheel Rotated
So That Bubble is Centered Between Tick
Marks When Mounted On Two Bolts
Straddling Nozzle Centerline
Содержание T17
Страница 1: ...GE Oil Gas Flow 916 128 Rev D September 2020 Model T17 Ultrasonic Flow Transducer Installation Guide ...
Страница 2: ......
Страница 4: ...ii no content intended for this page ...
Страница 62: ...Chapter 2 Installing the Pipe Nozzles 54 Model T17 Installation Guide no content intended for this page ...
Страница 64: ...Chapter 3 Installing an Isolation Valve 56 Model T17 Installation Guide no content intended for this page ...
Страница 88: ...Chapter 6 Specifications 80 Model T17 Installation Guide no content intended for this page ...
Страница 90: ...Warranty 82 Model T17 Installation Guide no content intended for this page ...
Страница 92: ......
Страница 93: ......