Chapter 2. Installing the Pipe Nozzles
26
Model T17 Installation Guide
2.3.3 Determining and Marking the Second Nozzle Location - MR1 Mid-Radius (cont.)
4.
Mark a line on the piece of film at a distance AS from the left edge, as shown in
Figure 34: Film Cut to Size and Marked
•
Example:
To demonstrate the calculations, consider an
MR1
installation for a
STD Schedule, 48” pipe
.
a.
From standard pipe tables: pipe
OD = 48.000 in.
and pipe wall thickness
(W) = 0.375 in.
b.
From the 1st equation:
Y
0
= (48.000 - (2 x 0.375))/2) x 0.5 =
11.813 in.
c.
From the 2nd equation:
X
0
= SQRT ((48/2)
2
- (11.81)
2
) =
20.892 in.
d.
From the 3rd equation:
β
= ATAN (20.90/11.81) =
1.056 radian
e.
Thus,
AS
= 48.000 x 1.056 =
50.697 in.
(
Note that this is the same value listed in
.)
Note:
In the above example, the tabulated pipe OD of 48.000 in. was used in the calculations for clarity. Ideally, the
measured average pipe OD from step 2 on the previous page would be used instead.
S
L
AS
Mark Line
Y
0
D 2W
–
2
-------------------
Chord Location
(
)
×
=
where, W = 0.375 inches and Chord Location = 0.5
X
0
D
2
----
2
Y
0
(
)
2
–
=
where, D
Average pipe OD (see step 2)
=
β
(radian)
X
0
Y
0
-------
atan
=
AS
D
β
×
=
where, D
Average pipe OD (see step 2)
=
Содержание T17
Страница 1: ...GE Oil Gas Flow 916 128 Rev D September 2020 Model T17 Ultrasonic Flow Transducer Installation Guide ...
Страница 2: ......
Страница 4: ...ii no content intended for this page ...
Страница 62: ...Chapter 2 Installing the Pipe Nozzles 54 Model T17 Installation Guide no content intended for this page ...
Страница 64: ...Chapter 3 Installing an Isolation Valve 56 Model T17 Installation Guide no content intended for this page ...
Страница 88: ...Chapter 6 Specifications 80 Model T17 Installation Guide no content intended for this page ...
Страница 90: ...Warranty 82 Model T17 Installation Guide no content intended for this page ...
Страница 92: ......
Страница 93: ......