Q1
Q2
1
2
3
4
Q1
Q2
UPS 1
UPS 2
Next parallel
unit 3, 4, 5, 6
JA1
JB1
JA
JB
JB1
JA1
JA2
JB2
JA1
JB1
JB
JA
JB2
JA2
3
4
1
2
3
4
1
2
SGSU_225
-300_S2_R
PA control
bus cable
_03US
12
1
13
2
5
14 15
3
4
16
22
11
17
6
18
7
21
8
9
19 20 10
3
4
2
1
6
18
7
12
1
13
2
5
14 15
3
4
16 17
22
11
21
8 9
19 20 10
Fig. 3.9.3-3 Control bus cable routing and connection
Control bus cables routing
Place and fix the cables
JA-1/2/3/4/5
and
JB-1/2/3/4/5
inside the UPS cabinets in the position
illustrated in the drawing.
NOTE !
Pay attention when cabling and routing the bus cables
JA
and
JB
inside the UPS
cabinet.
In case one unit should be removed from the parallel system, the bus cables
JA
and
JB
must be removed from the cabinet without disconnecting them from the
metal plate where the sockets
JA
and
JB
are located
.
For reliability reasons the cables
JA-1/2/3/4/5
and
JB-1/2/3/4/5
connecting the units should be run
in separated protected conduits (as indicated in
Fig. 3.9.3-3)
separated from the power cables.
It is important that the cable
JA
must be the same length as cable
JB
.
WARNING !
Connection and commissioning of an additional UPS to an existing parallel system,
must be performed by a GE SERVICE ENGINEER from of your
Service Center
.
Modifications reserved