SecoGear – Installation, Operation and Maintenance Manual 38 of 56
Figure 5-11. Lift Truck Arm (Left) Aligned with Switchgear Guide Slot (Right)
Figure 5-9. Cable Winch Spool
Figure 5-10. Cable Secured to Hoist
4. Push the lift truck forward so that the rail guide arms fully
engage the switchgear, Figure 5-12.
Figure 5-12. Lift Truck Guide Arm Stops
5. Lock the lift truck in position by pressing down on the floor
lock lever, Figure 5-13.
Figure 5-8. Lift Truck Crank Handle
B. Insert Circuit Breaker into Switchgear Compartment
1. Check the lifting and interlocking mechanisms of the lift
truck for smooth operation, and inspect the cables in the
hand winch system for any signs of damage, fatigue, or wear
before proceeding.
2. Open the SecoGear compartment door, and position the lift
truck in front of the switchgear compartment.
3. Turn the hand winch clockwise to raise, or counterclockwise
to lower, the VCB into position, Figure 5-8. Adjust the
height of the VCB to align with the guide slots located in the
switchgear compartment, Figure 5-11.
6. Release the floor lock by depressing the lever on the right or
left-hand side of the floor lock and move the lift truck away,
Figure 5-7.
Figure 5-7. Release Floor Lock
Figure 5-13. Press the Front Lever to Lock Lift Truck