
70
RTT DESKTOP TEST SET– INSTRUCTION MANUAL
THE 239 MOTOR MANAGEMENT RELAY
CHAPTER 4: MOTOR MANAGEMENT & METERING
4.2.5
Interfacing to the RTT through the EnverVista 239 Setup Program
The following section demonstrates how to navigate, configure, and monitor the operation
of the 239 Relay using the EnerVista 239 Setup program.
4.2.5.1 Current
Z
Setup
: Enter the Phase CT Primary, then Save.
FIGURE 4–12: Current Setup
Z
Metering
: View the current values measured by the relay, in real-
time.
FIGURE 4–13: Current Metering
4.2.5.2 RTDs
Z
Setup
: Configure the RTD Type and the application, for each RTD.
FIGURE 4–14: RTD Setup