background image

Tools Needed

•  Slotted screwdriver
•  5/16 Nut driver
•  Pliers

INSTALLATION NOTES

Reference Installation Instructions in the 
Zoneline Owner’s Manual.
Branch circuit wires can be run from the sub-
base, up the chaseway and into the junction 
box where connections are made. Electrical 
connections can be made directly to the branch 
circuit using properly rated wire nuts or plugging 
the appropriate non-LCDI power cord into the 
receptacle in the sub-base.
See additional Installation Instructions with the 
sub-base kit and junction box kit.
Power supply kits or unit cords can be run from 
the junction box, through the chaseway and into 
the sub-base. 

Parts Included

•  Chaseway
•  Mounting Screws (4)
•  Chaseway Cover

Important Notes

•  This kit provides for connection between sub-

base and junction box for wiring system in 
accordance with the National Electric Code 
ANSI/NFPA No. 70-2014.

•  This kit is intended for use with sub-bases 

RAK204U, RAK204D15*, RAK204D20*, 
RAK204D30*, RAK204E15*, RAK204E20*, 
RAK204E30* and Junction Box RAK4002C.

  * All Series

Installation Instructions
for your new

Before you begin - Read these instructions completely and carefully.
IMPORTANT – OBSERVE ALL GOVERNING CODES AND ORDINANCES. 
Note to Installer – Be sure to leave these instructions with the Consumer. 
Note to Consumer – Keep these instructions with your Owner’s Manual for future reference.

RAK205CW

Chaseway Kit

WARNING

 

RISK OF ELECTRIC 

SHOCK. Disconnect the electrical power supply 
before wiring connections.

31-5000177  Rev. 0  10-18 GEA

Отзывы: