31
Installation Instructions
REPLACE THE BASE GRILLE
Replace the grille by installing the two Phillips
head screws.
7
SET THE CONTROLS
Set the controls to the recommended setting.
8
START THE ICEMAKER
Set the icemaker power switch to the
I (on)
position. The icemaker will not begin to operate
until it reaches its operating temperature
of 15°F (–9°C) or below. It will then begin
operation automatically. It will take 2–3
days to fill the ice bin.
NOTE:
In lower water pressure conditions, the water
valve may turn on up to 3 times to deliver
enough water to the icemaker.
9
Power
switch
Содержание PSHS6TGXSS - Profile 26' Dispenser...
Страница 86: ...Soutien au consommateur Conseils de d pannage Fonctionnement Mesures de s curit Installation 86 Notes...
Страница 129: ...Servicio al consumidor Solucionar problemas Operaci n Seguridad Instalaci n 129 Notas ge com...
Страница 130: ...130 Notas Solucionar problemas Servicio al consumidor Operaci n Seguridad Instalaci n...