
31
Installation Instructions
REPLACE THE BASE GRILLE
Replace the grille by installing the two
Phillips head screws.
7
SET THE CONTROLS
Set the controls to the recommended
setting.
8
START THE ICEMAKER
Set the icemaker power switch to the
I (on)
position. The icemaker will not
begin to operate until it reaches its
operating temperature of 15°F (–9°C)
or below. It will then begin operation
automatically. It will take 2–3 days to
fill the ice bin.
NOTE:
In lower water pressure conditions, the
water valve may turn on up to 3 times
to deliver enough water to the icemaker.
9
Power
switch
Содержание PSF26PGS
Страница 86: ...Soutien au consommateur Conseils de dépannage Fonctionnement Mesures de sécurité Installation 86 Notes ...
Страница 129: ...Servicio al consumidor Solucionar problemas Operación Seguridad Instalación 129 Notas ge com ...
Страница 130: ...130 Notas Solucionar problemas Servicio al consumidor Operación Seguridad Instalación ...