
TOOLS YOU WILL NEED:
•
Phillips-head screwdriver
•
1/4" and 5/16" nutdriver
•
•
Level
•
Carpenter's square
•
Measuring tape
•
Safety glasses
•
Flashlight
•
•
15/16" socket (optional for skid removal)
•
Gloves
•
Pliers
For New Installations Only:
•
Tubing cutter
•
Drill and appropriate bits
•
Hole saw set
Hot Water Line
Hole Saw Set
Level
Strain Relief
Drain Hose
Hose Clamp
1/4" and 5/16"
Nutdriver
15/16" Socket
Bucket
Tubing Cutter
Drill and Bits
Flashlight
Gloves
Phillips-Head
Screwdriver
Carpenter's
Square
6"
Adjustable
Wrench
Safety Glasses
Pliers
Installation Preparation
2
Measuring Tape
PARTS SUPPLIED
IN INSTALLATION PACKAGE:
•
Hose clamp, drain hose, plug buttons
•
2 mounting brackets for wood countertops or side
•
4 flat head wood screws
MATERIALS YOU WILL NEED:
•
90° elbow (3/4"hose internal thread on one end,
opposite end sized to fit water supply)
•
UL-listed wire nuts (3)
•
Masking Tape
Materials Needed for New Installations:
•
Air gap for drain hose, if required
•
Waste tee for house plumbing, if applicable
•
Electrical cable
•
Screw-type hose clamps
•
Strain relief for electrical connection
•
Hand shut-off valve (recommended)
•
Hot Water Line–3/8" minimum, copper tubing
(including ferrule, compression nut).
Hose Clamps
Waste Tee
Electrical Cable
Wire Nuts (3)
Mounting
Brackets
Literature
90°Elbow
Coupler for
optional drain
hose
Hand
Valve
Air Gap
Plug Buttons
Masking Tape
(if applicable)
4 Wood Screws
•
Literature, samples and/or coupons