background image

5

 

PACSystems RXi IPC QSG

  

 

 

GFK-2784J

 

 
 
 

Shutting Down the Computer 

Caution 

For ICRXIBN7xxxxx Models,

 to avoid damaging files, always shut down Windows software 

before removing power from the IPC. 

Caution 

For ICRXIBN7xxxxx Models,

 do not disconnect external devices, such as a flash drive or 

external DVD drive without first using the Windows Safely Remove Hardware feature to 

eject the device. Failure to observe this precaution could result in damage to data. 

 

 

To shut down the IPC  

1.

 

Press the Power On/Off switch briefly (between 100 ms and 4 sec), or select Shut Down from the Windows Start menu. 
This provides a controlled shutdown of the operating system before removing power from the system. The status indicator 
stays solid green while the IPC is shutting down and then turns off when the IPC has finished powering down. 

2.

 

To completely shut down the IPC, turn off or remove the power supplying the IPC. 

Note:

 

The power-off function of the On/Off switch can be disabled to avoid unplanned shutdown caused by accidentally 
pressing the On/Off switch. For details, refer to 

PACSystems RXi Box IPC User's Manual (GFK-2785)

 

 

Содержание PACSystems RXi Series

Страница 1: ...rnal disks provide highly reliable local long term data retention USB and SD Card interfaces enable program loading serial communications and removable data storage through standard devices Ordering I...

Страница 2: ...mental Specifications Note The Box IPC should be installed in a location that is not exposed to corrosive gases or liquids rain or direct sunlight and meets the environmental specifications listed in...

Страница 3: ...should it be necessary to transport or ship any part of the system Note For phone numbers and email addresses refer to the section Contact Information Verify that all components of the system have be...

Страница 4: ...damage has been caused by incorrect transportation operating storage conditions or handling To power up the unit press the Power On Off switch for at least second If you notice any damage remove powe...

Страница 5: ...o shut down the IPC 1 Press the Power On Off switch briefly between 100 ms and 4 sec or select Shut Down from the Windows Start menu This provides a controlled shutdown of the operating system before...

Страница 6: ...Connector Indicators Connectors Blue blinking Booting Blue slow fade S3 Sleep Green solid Running Red solid Fault R e s e r v e d R e s e r v e d R e s e r v e d S A T A D r i v e S t a t u s O v e r...

Страница 7: ...CPI Sleep State is S1 CPU Stop Clock The default settings send IPC to sleep state S1 The ring LED stays green while the IPC is in Sleep State S1 The ring LED fades blue while the IPC is in Sleep State...

Страница 8: ...Customer Care Email customercare ip ge com Primary language of support English Europe the Middle East and Africa Online Technical Support http support ge ip com Phone 800 1 433 2682 EMEA Direct Dial...

Отзывы: