Chapter 2. Installation
32
PACSystems* RX3i & RSTi-EP PROFINET IO-Controller User Manual
GFK-2571N
2.1
Pre-Installation Check
Upon receiving your RX3i equipment, carefully inspect all shipping containers for damage. If any part of the
system is damaged, notify the carrier immediately. The damaged shipping container should be saved as
evidence for inspection by the carrier.
As the consignee, it is your responsibility to register a claim with the carrier for damage incurred during
shipment. However, Automation & Controls at GE Energy Connections will fully cooperate with you, should
such action be necessary.
After unpacking the RX3i equipment, record all serial numbers. Serial numbers are required if you should need
to contact Customer Care during the warranty period. All shipping containers and all packing material should
be saved should it be necessary to transport or ship any part of the system.
Verify that all components of the system have been received and that they agree with your order. If the system
received does not agree with your order, contact Customer Care.
If you need technical help, contact Technical Support. For phone numbers and email addresses, see the
Contact Information page in the front of this manual.