background image

7

 

PACSystems RXi 19” Display QSG

  

 

 

GFK-2899B

 

 
 

 

 

Initial Startup 

 

You will need the following: 
 

 

24VDC, 64W power supply, Class 2 or LPS 

 

Power cord with 24 – 16 AWG wires; user 

calculates proper wire gauge according to 

local regulations 

 

One small blade flat head screwdriver for 

M2 and M2.5 machine screws 

 

VGA-compatible video monitor (optional) 

 

USB-compatible keyboard 

 

USB-compatible mouse (optional) 

 

Note:

 

The power supply used should be a UL listed power source providing voltage isolation with a SELV output, or a 
Class 2 power source. A readily accessible disconnect device shall be incorporated in the building installation 
wiring. 

 
The product is supplied with a Phoenix Contact part number 1827716 or 1851245 (spring loaded/quick release) power terminal 
block for use with a power supply. The power supply used must be a UL Listed Limited Power Source (LPS) or Class 2 power 
source.  

1. 

Attach the power supply output to the IPC’s power plug using 16 to 24 AWG (1.31 –
 0.20mm

2

).  For frame ground, use shortest length 16 AWG (1.31mm

2

) wire to ground. 

Recommended wire stripping length is 7mm (0.28 in). 
Tighten the screws that hold the wires to 4 lb-in (0.452 Nm). 

2. 

Insert the plug into the RXi Display’s input Power connector and securely tighten the 
attaching screws.  
The torque range for the attaching screws is 1.95–2.21 lb-in (0.22–0.25 Nm). 

3. 

If desired, attach a USB-compatible keyboard and a USB-compatible mouse. 

4. 

Power up the unit and check whether any concealed damage has been caused by incorrect transportation, 
operating/storage conditions or handling. 
To power up the unit, touch Power On/Off for at least ½ second. 
If you notice any damage, remove power from the unit immediately and secure it against unintentional use.  
During power up, you should see the normal operating system starting displays on the monitor.  
During normal power up and operation, the Power On/Off status indicator displays: 

 

Blinking blue

 while the IPC is starting up 

 

Solid green

 when the IPC has completed startup and is running 

 

Solid green 

when the IPC is restarted without a loss of power

 

5. 

The Windows 7 operating system starts in accordance with the BIOS settings. During power up, you should see the normal 
operating system starting on the monitor.  
Activate the Windows 7 Professional operating system license during initial power-up by following the on-screen prompts. 
The Windows 7 product key is printed on the Microsoft Certificate of Authenticity label, located on the side of the unit.  
To activate the operating system online, you will need to first configure the IPC’s Ethernet settings for operation on your 
network. 
 
 

 

 

FGND 0V +24V

Содержание PACSystems ICRXIDIXNE19LCTA

Страница 1: ...epth to the panel provides a sleek design The touchscreen offers superior abrasion resistance transmissive clarity and unsurpassed touch sensitivity Display mounting and installation only requires a s...

Страница 2: ...ta integrity Time of day clock RTC accuracy Maximum drift of 2 seconds day at 25 C Video Standard 15 pin VGA connector Maintenance ports Intended only for temporary connection Two Type A USB 2 0 SD st...

Страница 3: ...ed with operating system Environmental Specifications Note The Box IPC should be installed in a location that is not exposed to corrosive gases or liquids rain or direct sunlight and meets the environ...

Страница 4: ...persons or by users who have been instructed about the reasons for the restrictions applied to the location and about any precautions that shall be taken and Access is through the use of a tool or loc...

Страница 5: ...contact Customer Care For technical help contact Technical Support Before attempting to power up the RXi Display for the first time inspect the unit for loose or damaged components If damage is observ...

Страница 6: ...operator interface One person can install the display without the use of any special tools Note Mount the RXi Display on a flat surface in a UL NEMA Type 1 enclosure Note The cooling fins on the back...

Страница 7: ...tor and securely tighten the attaching screws The torque range for the attaching screws is 1 95 2 21 lb in 0 22 0 25 Nm 3 If desired attach a USB compatible keyboard and a USB compatible mouse 4 Power...

Страница 8: ...re to eject the device Failure to observe this precaution could result in damage to data 1 Touch the Power On Off switch briefly between 100ms and 4 seconds or select Shut Down from the Windows Start...

Страница 9: ...y QSG GFK 2899B Indicators and Connectors SD Card Slot User defined Menu Plus Minus Power On Off Overtemp SATA Drive Activity Bluetooth Wi Fi WWAN Input Power Ethernet 1 Ethernet 2 VGA USB 1 USB 2 Ser...

Страница 10: ...e when the unit is powered off Sleep Mode The default BIOS settings when shipped from the factory are Enable Hibernation is disabled ACPI Sleep State is S1 CPU Stop Clock The default settings send RXi...

Страница 11: ...shut down To recover let the unit cool then touch the Power On Off button Bluetooth Blue solid Bluetooth connected optional mPCIe card Wi Fi White solid Connected to wireless network optional mPCIe ca...

Страница 12: ...com Customer Care Email customercare ip ge com Primary language of support English Europe the Middle East and Africa Online Technical Support http support ge ip com Phone 800 1 433 2682 EMEA Direct D...

Отзывы: