2.2
Installation Procedure
1
Switch off your computer, and unplug it from the
socket-outlet.
2
NetPro 2000:
Disconnect the power cord from the
computer (rating 250Vac/10A) and connect this cord
to the mains input socket (2, fig. 1) of the UPS. See
fig. 2.
NetPro 3000/4000
models are equipped with a fixed
power cord (11, fig. 1).
3
Using the output cords provided, connect the
computer equipment to the appliance outlets (4, fig. 1)
of the unit. Spread the loads over the appliance outlets
as equally as possible. If you use a distribution box to
connect more than one appliance per outlet, please
note that the maximum AC-current rating of each
appliance outlet is 10A. See fig. 3.
Output 4a is programmable: see 3.4.3.
If your UPS is a 4000VA model please proceed with
step 5.
NetPro 2000/3000 only.
4
Battery extension pack(s) can be installed to
increase the battery runtime. Connect the DC
connector of the battery pack (9, fig. 1/4) to the DC
socket of the UPS (7, fig. 1/4). You will hear a click
when the cable is properly installed. Block the DC
connector: install the small locking plate (9a, fig. 4)
that came with the battery pack, and fasten it with
the screw provided. Using the DC connector of the
battery pack (10, fig. 1) you can install a second,
third, etc. pack. See 5.1 for more information.
5
Make sure the on/off switch (12, fig. 1) at the rear of the UPS is off, i.e. in position ‘0’, and connect
the mains cord of the UPS to a working, AC wall socket outlet equipped with a protective earth
connection. The fans start rotating: mains power is available and the batteries are charging.
6
For best results, allow the UPS to recharge the batteries during a period of approx. 12 hours. It is
acceptable to use the UPS without first charging the battery, but the runtime may be reduced.
7
For advanced communication possibilities, the RS232 interface port (3, fig. 1) can be connected
to a computer system and/or optional interface cards (5, fig. 1) can be added. See chapter 4.
Batt. extension pack
NetPro 2000VA
NetPro 3000/4000VA
fig. 2
fig. 3
fig. 4
9a
7
9
6
8
2
4
6
10
1
3
11
5
1
6
12
4a
3
7
9
7
RESET
OK
12
4
3000 VA
fig. 1