GE Multilin
G60 Generator Protection System
2-15
2 PRODUCT DESCRIPTION
2.2 SPECIFICATIONS
2
2.2SPECIFICATIONS
SPECIFICATIONS ARE SUBJECT TO CHANGE WITHOUT NOTICE
2.2.1 PROTECTION ELEMENTS
The operating times include the activation time of a trip rated form-A output contact unless otherwise indicated.
FlexLogic operands of a given element are 4 ms faster. Take this into account when using FlexLogic to interconnect
with other protection or control elements of the relay, building FlexLogic equations, or interfacing with other IEDs or
power system devices via communications or different output contacts. If not specified, operate times are given
here for a 60 Hz system at nominal system frequency. Operate times for a 50 Hz system are 1.2 times longer.
PHASE DISTANCE
Characteristic:
mho (memory polarized or offset) or
quad (memory polarized or non-direc-
tional), selectable individually per zone
Number of zones:
3
Directionality:
forward, reverse, or non-directional per
zone
Reach (secondary
Ω
):
0.02 to 500.00
Ω
in steps of 0.01
Reach accuracy:
±5% including the effect of CVT tran-
sients up to an SIR of 30
Distance:
Characteristic angle:
30 to 90° in steps of 1
Comparator limit angle: 30 to 90° in steps of 1
Directional supervision:
Characteristic angle:
30 to 90° in steps of 1
Limit angle:
30 to 90° in steps of 1
Right blinder (Quad only):
Reach:
0.02 to 500
Ω
in steps of 0.01
Characteristic angle:
60 to 90° in steps of 1
Left Blinder (Quad only):
Reach:
0.02 to 500
Ω
in steps of 0.01
Characteristic angle:
60 to 90° in steps of 1
Time delay:
0.000 to 65.535 s in steps of 0.001
Timer accuracy:
±3% of operate time or ±1/4 cycle
(whichever is greater)
Current supervision:
Level:
line-to-line current
Pickup:
0.050 to 30.000 pu in steps of 0.001
Dropout:
97 to 98%
Memory duration:
5 to 25 cycles in steps of 1
VT location:
all delta-wye and wye-delta transformers
CT location:
all delta-wye and wye-delta transformers
Voltage supervision pickup (series compensation applications):
0 to 5.000 pu in steps of 0.001
Operation time:
1 to 1.5 cycles (typical)
Reset time:
1 power cycle (typical)
STATOR DIFFERENTIAL
Pickup:
0.050 to 1.00 pu in steps of 0.01
Slope 1 and 2:
1 to 100% in steps of 1
Break 1:
1.00 to 1.50 pu in steps of 0.01
Break 2:
1.50 to 30.00 pu in steps of 0.01
Operate time:
<¾ cycle at
I
diff
> 5 × pickup
RESTRICTED GROUND FAULT
Pickup:
0.005 to 30.000 pu in steps of 0.001
Dropout:
97 to 98% of pickup
Slope:
0 to 100% in steps of 1%
Level accuracy:
0.1 to 2.0 x CT rating: ±0.5% of reading or ±1% of rated (which-
ever is greater)
>2.0 x CT rating
±1.5% of reading
Pickup delay:
0 to 600.00 s in steps of 0.01
Dropout delay:
0 to 600.00 s in steps of 0.01
Operate time:
<1 power system cycle
PHASE/NEUTRAL/GROUND TOC
Current:
Phasor or RMS
Pickup level:
0.000 to 30.000 pu in steps of 0.001
Dropout level:
97% to 98% of pickup
Level accuracy:
0.1 to 2.0
×
CT:
±0.5% of reading or ±0.4% of rated
(whichever is greater)
> 2.0
×
CT:
±1.5% of reading > 2.0
×
CT rating
Curve shapes:
IEEE Moderately/Very/Extremely
Inverse; IEC (and BS) A/B/C and Short
Inverse; GE IAC Inverse, Short/Very/
Extremely Inverse; I
2
t; FlexCurves™
(programmable); Definite Time (0.01 s
base curve)
Curve multiplier:
Time Dial = 0.00 to 600.00 in steps of
0.01
Reset type:
Instantaneous/Timed (per IEEE)
Curve timing accuracy
at 1.03 to 20 x pickup:
±3.5% of operate time or ±½ cycle
(whichever is greater) from pickup to
operate
Voltage restraint:
Modifies pickup current for voltage in the
range of 0.1<V<0.9 VT Nominal in a
fixed linear relationship
NOTE
Содержание Multilin g60
Страница 10: ...x G60 Generator Protection System GE Multilin TABLE OF CONTENTS INDEX ...
Страница 32: ...1 22 G60 Generator Protection System GE Multilin 1 5 USING THE RELAY 1 GETTING STARTED 1 ...
Страница 130: ...3 68 G60 Generator Protection System GE Multilin 3 4 FIELD AND STATOR GROUND MODULES 3 HARDWARE 3 ...
Страница 160: ...4 30 G60 Generator Protection System GE Multilin 4 3 FACEPLATE INTERFACE 4 HUMAN INTERFACES 4 ...
Страница 486: ...5 326 G60 Generator Protection System GE Multilin 5 10 TESTING 5 SETTINGS 5 ...
Страница 518: ...6 32 G60 Generator Protection System GE Multilin 6 5 PRODUCT INFORMATION 6 ACTUAL VALUES 6 ...
Страница 532: ...7 14 G60 Generator Protection System GE Multilin 7 2 TARGETS 7 COMMANDS AND TARGETS 7 ...
Страница 538: ...8 6 G60 Generator Protection System GE Multilin 8 1 PHASE DISTANCE THROUGH POWER TRANSFORMERS 8 THEORY OF OPERATION 8 ...
Страница 748: ...D 10 G60 Generator Protection System GE Multilin D 1 IEC 60870 5 104 APPENDIX D D ...
Страница 760: ...E 12 G60 Generator Protection System GE Multilin E 2 DNP POINT LISTS APPENDIX E E ...