5-32
G60 Generator Protection System
GE Multilin
5.2 PRODUCT SETUP
5 SETTINGS
5
When the local receiver again detects a signal, the local transmitter automatically returns to normal operation.
If a Far-End Fault pattern is received by a fiber interface that supports the Far-End Fault feature and it is enabled, it reacts
by dropping the link as if there were no signal at all.
If the receiving interface does not support the Far-End Fault feature or has it disabled, an incoming Far-End Fault pattern is
ignored.
It is strongly recommended to have switches used at substation automation support the Far-End Fault feature, especially
when UR 7 redundancy Failover is selected for redundancy purpose.
f) PARALLEL REDUNDANCY PROTOCOL (PRP)
The Parallel Redundancy Protocol (PRP) defines a redundancy protocol for high availability in substation automation net-
works. It applies to networks based on Ethernet technology (ISO/IEC 8802-3) and is based on the second edition (July
2012) of the IEC 62439-3, clause 4.
PRP is designed to provide seamless recovery in case of a single failure in the network, by using a combination of LAN
duplication and frame duplication technique. Identical frames are sent on two completely independent networks that con-
nect source and destination. Under normal circumstances both frames reach the destination and one of them is sent up the
OSI stack to the destination application, while the second one is discarded. If an error occurs in one of the networks and
traffic is prevented from flowing on that path, connectivity is still provided through the other network to ensure continuous
communication. Take care when designing the two LANs, so that no single point of failure (such as a common power sup-
ply) is encountered, as such scenarios can bring down both LANs simultaneously.
Figure 5–7: EXAMPLE OF PARALLEL REDUNDANT NETWORK
PRP uses specialized nodes called doubly attached nodes (DANPs) for handling the duplicated frames. DANPs devices
have an additional module, called Link Redundancy Entity (LRE). LRE is responsible for duplicating frames and adding the
specific PRP trailer when sending the frames out on the LAN, as well as making decisions on received frames as to which
one is sent up the OSI stack to the application layer and which one is discarded. LRE is responsible for making PRP trans-
parent to the higher layers of the stack. There is a second type of specialized device used in PRP networks, called RedBox,
with the role of connecting Single Attached Nodes (SANs) to a redundant network.
UR relays implement only the DANP functionality. The RedBox functionality is not implemented.
The original standard IEC 62439-3 (2010) was amended to align PRP with the High-availability Seamless Redundancy
(HSR) protocol. To achieve this, the original PRP was modified at the cost of losing compatibility with the PRP 2010 ver-
sion. The revised standard IEC 62439-3 (2012) is commonly referred to as PRP-1, while the original standard is PRP-0.
The UR relays support only PRP-1.
The relay implements PRP on two of its Ethernet ports, specifically Port 2 and 3 of the CPU module. Use the previous sec-
tion (network port configuration) to configure PRP.
PRP is purchased as a separate option. If purchased (valid order code), PRP can be enabled in configuration through a
setting available on the network configuration menu, REDUNDANCY, which already has the capability of enabling failover
redundancy. The options on this setting must be changed to accommodate two types of redundancy: failover and PRP.
When REDUNDANCY is set to either failover or PRP, the ports dedicated for PRP (Port 2 and 3) operate in redundant
mode. In this mode, Port 3 uses the Mac, IP address, and mask of Port 2.
Содержание Multilin g60
Страница 10: ...x G60 Generator Protection System GE Multilin TABLE OF CONTENTS INDEX ...
Страница 32: ...1 22 G60 Generator Protection System GE Multilin 1 5 USING THE RELAY 1 GETTING STARTED 1 ...
Страница 130: ...3 68 G60 Generator Protection System GE Multilin 3 4 FIELD AND STATOR GROUND MODULES 3 HARDWARE 3 ...
Страница 160: ...4 30 G60 Generator Protection System GE Multilin 4 3 FACEPLATE INTERFACE 4 HUMAN INTERFACES 4 ...
Страница 486: ...5 326 G60 Generator Protection System GE Multilin 5 10 TESTING 5 SETTINGS 5 ...
Страница 518: ...6 32 G60 Generator Protection System GE Multilin 6 5 PRODUCT INFORMATION 6 ACTUAL VALUES 6 ...
Страница 532: ...7 14 G60 Generator Protection System GE Multilin 7 2 TARGETS 7 COMMANDS AND TARGETS 7 ...
Страница 538: ...8 6 G60 Generator Protection System GE Multilin 8 1 PHASE DISTANCE THROUGH POWER TRANSFORMERS 8 THEORY OF OPERATION 8 ...
Страница 748: ...D 10 G60 Generator Protection System GE Multilin D 1 IEC 60870 5 104 APPENDIX D D ...
Страница 760: ...E 12 G60 Generator Protection System GE Multilin E 2 DNP POINT LISTS APPENDIX E E ...