D400 SUBSTATION GATEWAY INSTRUCTION MANUAL
GE INFORMATION
97
D400 Substation Gateway
Chapter 7: Setting Up the D400 for
Redundancy
Setting Up the D400 for Redundancy
This chapter describes how to:
•
“Configure Warm-Standby redundancy” on page 97
•
“Configure Hot-Standby redundancy” on page 100
Do not share the root user's password and do not forget it; this is crucial information.
No method is available to regenerate a lost password.
Prerequisites
In order to set up two D400s for redundant operation, the following is required:
•
Two D400s running Firmware R5.01 Production Build
•
An SSH client: PuTTY.exe (http://en.wikipedia.org/wiki/PuTTY)
•
KVM set connected to the D400s
Configure Warm-Standby redundancy
Before configuring the D400s for Warm-Standby redundancy, ensure that the listed
“Prerequisites” on page 97 are on-hand.
The procedure to configure Warm -Standby Redundancy in a D400 R5.01 comprises the
following tasks:
•
“Task 1: Warm standby - Configure the D400s for operation” on page 98
•
“Task 2: Warm standby - Connect the D400s” on page 98
•
“Task 3: Warm standby - Create user accounts” on page 98
•
“Task 4: Warm standby - Configure the primary D400 for redundancy” on page 98
•
“Task 5: Warm standby - Configure the secondary D400 for redundancy” on page 99
•
“Task 6: Warm standby - Verify configuration” on page 100
•
“Task 7: Warm standby - Verify redundant D400 operation” on page 100
Содержание Multilin D400
Страница 12: ...12 GE INFORMATION D400 SUBSTATION GATEWAY INSTRUCTION MANUAL PRODUCT SUPPORT ...
Страница 28: ...28 GE INFORMATION D400 SUBSTATION GATEWAY INSTRUCTION MANUAL CHAPTER 1 BEFORE YOU START ...
Страница 34: ...34 GE INFORMATION D400 SUBSTATION GATEWAY INSTRUCTION MANUAL CHAPTER 2 INSTALLING THE D400 ...
Страница 80: ...80 GE INFORMATION D400 SUBSTATION GATEWAY INSTRUCTION MANUAL CHAPTER 4 CONNECTING TO DEVICES AND NETWORKS ...
Страница 88: ...88 GE INFORMATION D400 SUBSTATION GATEWAY INSTRUCTION MANUAL CHAPTER 5 POWERING UP THE D400 ...
Страница 104: ...104 GE INFORMATION D400 SUBSTATION GATEWAY INSTRUCTION MANUAL CHAPTER 7 SETTING UP THE D400 FOR REDUNDANCY ...
Страница 118: ...118 GE INFORMATION D400 SUBSTATION GATEWAY INSTRUCTION MANUAL CHAPTER 9 ABOUT THE D400 APPLICATIONS ...
Страница 126: ...126 GE INFORMATION D400 SUBSTATION GATEWAY INSTRUCTION MANUAL CHAPTER 10 INTRODUCING THE D400 CONFIGURATION ...
Страница 158: ...158 GE INFORMATION D400 SUBSTATION GATEWAY INSTRUCTION MANUAL CHAPTER 12 USING THE D400 LOCAL CONFIGURATION UTILITY ...
Страница 174: ...174 GE INFORMATION D400 SUBSTATION GATEWAY INSTRUCTION MANUAL APPENDIX A STANDARDS PROTECTION ...
Страница 184: ...184 GE INFORMATION D400 SUBSTATION GATEWAY INSTRUCTION MANUAL APPENDIX C LIST OF ACRONYMS ...
Страница 192: ...192 GE INFORMATION D400 SUBSTATION GATEWAY INSTRUCTION MANUAL INDEX ...