
Installation
36" Vent Hood
Install Duct
Bracket
Step
6
9
• Install the 2 small screws into the sides of the
duct bracket. Remove the screws. This will
insure ease of final installation.
• Temporarily install a length of 6" duct
between the hood outlet and the ductwork at
the ceiling.
• Position the upper duct bracket behind the
duct and against the wall and ceiling.
• Mark the 4 screw locations.
• Remove the bracket and temporary duct
section.
• Drill 1/8" pilot holes in marked locations.
• If pilot holes did not enter studs, enlarge the
holes to 3/8" and install molly bolt anchors.
• Secure the bracket to the ceiling and wall
with wood screws and/or molly bolts.