background image

10

STEP 8  START ICEMAKER

• Flip the switch to I (ON) position. The icemaker 

will not begin to operate until it reaches its 
operating temperature of 15°F (–9°C)or below. 
It will then begin operation automatically. It will 
take 2–3 days to fill the ice bin.

• Be sure nothing interferes with the sweep of the

feeler arm. Do not place objects in the path of the
feeler arm.

• Discard the first full bucket of ice cubes.
• To turn the icemaker off, set the switch to O (OFF).

STEP 9  TEMPERATURE

CONTROLS

• The temperature controls are preset at 37° for the

refrigerator and 0°F for the freezer.

• Allow 24 hours to stabilize before making

adjustments.

STEP 10  INSTALL TOEKICK

• Press toekick into position and reinstall one screw

on each side.

IMPORTANT:

The vented toekick must remain 

unobstructed for proper air circulation.

Power Switch

Feeler Arm

Toekick Screw

Installation Instructions

Содержание Monogram ZFSB25D SS

Страница 1: ...If you have questions call 800 GE CARES or visit our website at www monogram com Installation Instructions Free Standing Side by Side Stainless Steel Refrigerator ZFSB25D SS ZFSB26D SS...

Страница 2: ...these instructions for local inspector s use IMPORTANT Observe all governing codes and ordinances Note to Installer Be sure to leave these instructions with the Consumer Note to Consumer Keep these in...

Страница 3: ...and water supply located as shown Additional Specifications A 115 volt 60Hz 15 or 20 amp power supply is required An individual properly grounded branch circuit or circuit breaker is recommended Inst...

Страница 4: ...rigerator where you are working GROUNDING THE REFRIGERATOR IMPORTANT Please read carefully FOR PERSONAL SAFETY THIS APPLIANCE MUST BE PROPERLY GROUNDED The power cord of this appliance is equipped wit...

Страница 5: ...is best to remove one door at a time A Remove 2 screws on top and 2 screws at the back of the top cap Lift off top cap B Open both doors Remove the 2 toekick screws and pull forward to remove C Discon...

Страница 6: ...on top of the refrigerator one on each side Push the top cap forward and lift up from the rear B Remove 2 screws holding the top filler strip lift off C Open both doors Remove the 2 toekick screws an...

Страница 7: ...of about 10 NOTE The only GE approved plastic tubing is supplied in GE SmartConnect Refrigerator Tubing kits Do not use any other plastic water supply line because the line is under pressure at all t...

Страница 8: ...ply Insert the end of the copper tubing into the refrigerator connection at the back of the refrigerator as far as possible Hold the tubing in place and tighten the fitting If you are using GE SmartCo...

Страница 9: ...or wrench to turn the door adjusting screw Turn the screw to the right to raise the door turn left to lower the door NOTE A nylon plug is imbedded in the threads of the pin The plug is designed to pr...

Страница 10: ...in the path of the feeler arm Discard the first full bucket of ice cubes To turn the icemaker off set the switch to O OFF STEP 9 TEMPERATURE CONTROLS The temperature controls are preset at 37 for the...

Страница 11: ...11 Notes...

Страница 12: ...ll 1 800 444 1845 NOTE Product improvement is a continuing endeavor at General Electric Therefore materials appearance and specifications are subject to change without notice Pub No 49 60476 Dwg No 19...

Отзывы: