![GE MG-101 Скачать руководство пользователя страница 20](http://html.mh-extra.com/html/ge/mg-101/mg-101_user-manual_128400020.webp)
Chapter 2. Setup and Operation
12
MG-101 User’s Manuall
2.2.3 Using Data Table 2
For calibration points found in
Data Table 2
, refer to
and proceed as follows:
1.
Fully
close the vent valve by turning it clockwise.
CAUTION!
Make the following adjustments slowly, being careful not to overshoot the target value. NEVER
ALLOW THE SYSTEM TO GO TO A VALUE WETTER THAN THE TARGET VALUE. If you overshoot a
value in the wetter direction, you will have to allow the system to equilibrate (dry down) again
before you can proceed.
2.
Fully
close the
DRY GAS FIRST DILUTION VALVE
by turning it clockwise.
3.
Consult
Data Table 2
for the desired dew/frost point temperature and find the corresponding value in the column
headed
DRY GAS (SECOND DILUTION)
. Adjust the valve on the
DRY GAS SECOND DILUTION
rotameter to obtain the
value shown in the table.
IMPORTANT:
Be sure to read the steel ball or glass ball (
S
or
G
), as indicated in the table.
4.
By referring to the desired dew/frost point temperature in
Data Table 2
, find the corresponding value in either the
column headed
WET GAS
or the column headed
WET GAS DILUTED
(a given value appears in one column or the
other, but not both). Adjust the valve on the
WET GAS
rotameter (but not on the
Wet Gas Diluted
rotameter, which
must remain fully open) to obtain the reading indicated on either the
WET GAS
or the
WET GAS DILUTED
rotameter
scales (whichever is indicated in the table).
IMPORTANT:
Be sure to read the steel ball or glass ball (
S
or
G
), as indicated in the table.
After equilibrium has been established, the MG-101 will be delivering a calibration gas with the selected dew/frost
point temperature.
After you have completed the calibration or other calibrated moisture operation at this dew/frost point temperature,
either shut down the system (see
below), or repeat the steps in this section for the next calibration
point.
2.2.4 System Shutdown
If you are not planning another calibration run, you must shut the system down as follows:
1.
Fully
open the vent valve by turning it counter-clockwise.
2.
Fully
close the
WET GAS VALVE
by turning it clockwise.
3.
Fully
close the
DRY GAS FIRST DILUTION VALVE
by turning it clockwise.
4.
Fully
close the
DRY GAS SECOND DILUTION VALVE
by turning it clockwise.
5.
Set the
WET/DRY VALVE
to
DRY
.
Содержание MG-101
Страница 1: ...GE Measurement Control Moisture 910 115 Rev E March 2012 MG 101 User s Manual ...
Страница 2: ......
Страница 4: ...ii no content intended for this page ...
Страница 8: ...Contents vi MG 101 User s Manual no content intended for this page ...
Страница 12: ...Chapter 1 General Information 4 MG 101 User s Manual no content intended for this page ...
Страница 22: ...Chapter 2 Setup and Operation 14 MG 101 User s Manual no content intended for this page ...
Страница 32: ...Warranty 24 MG 101 User s Manual no content intended for this page ...
Страница 33: ......