A.17
M-PACT Plus
Time Curr
ent Cur
v
e
s
A
B
C
X
MPRO 27 & 50 Electronic Trip Unit
1,00
10,00
MPRO 27 & 50 Electronic Trip Unit
10
1
0,8
0,6
0,4
0,2
0,1
0,01
0,10
Tripping Time In Seconds (s)
x Breaker rating In
1,00
10,00
1
0,8
0,6
0,4
0,2
0,1
0,01
0,10
Tripping Time In Seconds (s)
x Breaker rating In
GF set on breaker rating In
0,1 to 1 × In in steps of 0,01
Setting Range
GF set on breaker rating In
0,1 to 1 × In in steps of 0,01
Setting Range
- Time Current Curve
- Band GFDB 01
- Band GFDB 03
- Band GFDB 05
- Band GFDB 07
- Band GFDB 09
- Band GFDB 11
- Band GFDB 13
GF- Protection Device
I
2
t “max” -ON-
- Time Current Curve
- Band GFDB 02
- Band GFDB 04
- Band GFDB 06
- Band GFDB 08
- Band GFDB 10
- Band GFDB 12
- Band GFDB 14
GF- Protection Device
I
2
t “max” -ON-
13
13
11
9
7
5
3
1
11
9
7
5
3
1
14
12
10
8
6
4
4
6
8
10
12
14
2
2
Green Iine = Full Clearing time
Red Line = Non Tripping time
Green Iine = Full Clearing time
Red Line = Non Tripping time
Time Current Curves (cold state) - GF Protection Device
Содержание M-Pact Plus
Страница 1: ...GE Energy Industrial Solutions Air Circuit Breakers 400 4000A M PACT PlusED 03 GE imagination at work...
Страница 2: ......
Страница 4: ...A 2 M PACT Plus A B C X M PACT Plus M PACT Plus Air Circuit Breaker 400 4000A...
Страница 26: ...A 24 M PACT Plus A B C X Notes...
Страница 28: ...B 2 Order codes A B C X M PACT Plus Notes...
Страница 68: ...M PACT Plus A B C X Notes...
Страница 75: ......