GE
RAFT
LOGIQ P9/P7
D
IRECTION
5604324
, R
EVISION
11
DRAFT (J
ANUARY
24, 2019)
S
ERVICE
M
ANUAL
10-6
Section 10-5 - System Maintenance
Section 10-5
System Maintenance
10-5-1
Preliminary Checks
The preliminary checks take about 15 minutes to perform. Refer to the system user documentation
whenever necessary.
Table 10-4 System Checks
Step
Item
Description
1
Ask & Listen
Ask the customer if they have any problems or questions about the equipment.
2
Paperwork
Fill in the top of the Ultrasound Inspection Certificate (see:
page 10-35
).
Note all probes and system options.
3
Power up
Turn the system power on and verify that all fans and peripherals turn on.
Watch the displays during power up to verify that no warning or error messages are displayed.
4
Probes
Verify that the system properly recognizes all probes.
5
Displays
Verify proper display on the LCD monitor and Touch Panel.
6
Presets
“Full Backup” all customer presets on Hard disk and/or DVD (see:
Settings - Backup and Restore on
).
7
Image Archive
Backup the Image Archive on DVD, USB-Stick, etc. (see:
see: "Settings - Backup and Restore" on
).
Содержание LOGIQ P9
Страница 2: ......
Страница 11: ...GE LOGIQ P9 P7 DIRECTION 5604324 REVISION 11 SERVICE MANUAL ix ZH CN KO ...
Страница 40: ...GE LOGIQ P9 P7 DIRECTION 5604324 REVISION 11 SERVICE MANUAL xxxviii Table of Contents ...
Страница 184: ...GEDRAFT LOGIQ P9 P7 DIRECTION 5604324 REVISION 11 DRAFT JANUARY 24 2019 SERVICE MANUAL Chapter 4 Functional Checks 4 44 ...
Страница 601: ...This page was intentionally left blank ...