GE
DRAFT
LOGIQ P9/P7
D
IRECTION
5604324
, R
EVISION
11
DRAFT (J
ANUARY
24, 2019)
S
ERVICE
M
ANUAL
Chapter 8 - Replacement Procedures
8-111
3) Remove EEPROM from replacement MCB board if present.
4) Verify direction of the EEPROM Slot by aligning EEPROM “notch” mark to that of MCB board. print
mark.
Figure 8-124 Aligning EEPROM
NOTE:
Inserting EEPROM in wrong direction will result in permanent damage to EEPROM or to MCB board.
Proceed with caution.
5) Verify tips of all 8 pins are aligned with socket.
6) Gently push down EEPROM to its position.
8-17-12
Separating MCB assy from Brackets and COM Express
1) Remove 7 screws around MCB assy. Refer to following figure.
Figure 8-125 Screw points around MCB assy
Alignment marks
U44 Socket
(print mark)
Содержание LOGIQ P9
Страница 2: ......
Страница 11: ...GE LOGIQ P9 P7 DIRECTION 5604324 REVISION 11 SERVICE MANUAL ix ZH CN KO ...
Страница 40: ...GE LOGIQ P9 P7 DIRECTION 5604324 REVISION 11 SERVICE MANUAL xxxviii Table of Contents ...
Страница 184: ...GEDRAFT LOGIQ P9 P7 DIRECTION 5604324 REVISION 11 DRAFT JANUARY 24 2019 SERVICE MANUAL Chapter 4 Functional Checks 4 44 ...
Страница 601: ...This page was intentionally left blank ...