If  possible,  GE  suggests  disconnecting 
the equipment to perform the following 
examinations: 

 

1)

 

Insulator: 

Depending 

on 

the 

pollution  level,  it  is  necessary  to 
clean the porcelain; 

2)

 

Metallic  components:  check  for 
corrosion; 

3)

 

Tightening  torque  of  primary  and 
secondary 

connections. 

Any 

adjustments  shall  be  conducted  as 
described  in  the  item 

“Primary 

Terminals”

 of this document; 

4)

 

Secondary terminal box: If necessary 
clean inside the terminal box. 

5)

 

Verify oil level indicator and if there 
is any signal of oil leakage; 

6)

 

Remove the top cover to have access 
to  the  bellows  and  verify  if  there  is 
any  signal  of  oil  leakage  near  the 
fixation of the bellows and / or if the 
bellows is in good condition. 

 
Tests 

 

It  is  recommended  after  the  first  few 
hours of operation and whenever there 
is a change in the primary current (in the 
bar 

connection), 

performing 

the 

measurement  of  the  primary  terminal 
temperature with a proper temperature 
measuring instrument. 
 
It  is  advised  to  perform  the  following 
tests  before  putting  the  equipment  in 
operation  and  thereafter  at  four-year 
intervals  depending  on  availability  of 
the: 

 

1)

 

Ratio (TTR); 

2)

 

Polarity (Polarity meter); 

3)

 

Saturation  Voltage  (ac  voltage 
source, Voltmeter and Ammeter); 

4)

 

Ohm 

Resistance 

(Wheatstone 

bridge); 

5)

 

Insulation  Resistance  with  any 
megohmmeter; 

6)

 

Tan 

δ

  of  the  HV  insulation  (Double 

M4100,  Omicron  CPC100  or  any 
equivalent). 

 

Important remark:

  

During  commissioning  and  tests,  it  is 
recommended  recording  the  results 
acquired in the tests abovementioned. 

 

In  case  of  doubts,  please  contact  the 
technical assistance support of GE: +55 
35 3629 7042 or 7038 or 7000 

 

10.

 

PROPER DISPOSAL OF 
TRANSFORMERS COMPONENTS 
AFTER LIFESPAN 

 

The instrument transformers are mainly 
composed of the following components, 
which  after 

transformer’s

  lifespans 

require  a  properly  disposal  in  order  to 
prevent environmental contamination. 
 

Components 

Recommended 

Disposal 

Metallic materials 

Metal recycling 
company 

Resin and 
materials 
saturated with 
resin 

Oil disposing 
company properly 
licensed to perform 
such activity 

Oil (PCB-free) 

 

classified as Class I 
hazardous residue 

Oil disposing 
company properly 
licensed to perform 
such activity 

Material 
contaminated with 
oil 

Co-processing or 
incineration at a 
company properly 
licensed  

Porcelain insulator  Industrial landfill 

properly licensed 

Содержание KOTEF 72.5

Страница 1: ...GE Grid Solutions INSTRUCTION MANUAL MIITR102 COMBINED INSTRUMENT TRANSFORMER KOTEF 72 5 245...

Страница 2: ...Instruction Manual GE Grid Solutions 2 GE Grid Solutions Av Nossa Senhora da Piedade 1021 37504 358 Itajub MG Brasil AIB 00 07 28 21 FML FES Owner revision Date Prepared Approved...

Страница 3: ...as the inherent capacitance may have electric charges with voltage at the lethal level In addition a ground rod should stay on the line terminal as long as people work on the unit In the event an elec...

Страница 4: ...3 3 Unpacking 8 3 4 Storage 9 4 BELLOWS BLOCKING SYSTEM AND ASSEMBLY IN THE STRUCTURE 9 4 1 Bellows blocking system 9 4 2 Assembly in the structure 10 5 CONTACT SURFACES PREPARATION 10 6 CONNECTIONS 1...

Страница 5: ...to the picture below 1 Top Cover 2 Oil Level Indicator metallic bellows 3 Primary Reconnection Terminals 4 Primary terminals aluminum or copper 5 CT Headhousing current transformer part 6 Porcelain or...

Страница 6: ...All secondary windings are enclosed in an aluminum box which protects them against high frequency disturbances while acting as a low voltage shielding electrode This aluminum box is extended up to the...

Страница 7: ...t mounted to the crate skid and the head resting on damping foam For overseas shipment the CIT is packed in wooden crates designed according to SEI cat 4 specification The crates can be stacked but no...

Страница 8: ...extremities Attention NEVER lift a transformer by its primary terminals Lift it by the lifting eyes on the transformer top All four lifting eyes must be used during lifting operation To lift the tran...

Страница 9: ...tly compressed by the top cover A protection of plastic film is also put in place around the bellows to protect it against contact with the top cover In order to remove the blocking system place the t...

Страница 10: ...with sandpaper 150 grain in order to eliminate the oxidation layer Scrub the contact surfaces with a metallic brush diameter of the thread 0 3mm and impregnate with grease of the type PENETROX or equi...

Страница 11: ...peration 6 5 Terminal marking Primary and secondary terminal marking are done according to the specified standard please refer to the set of drawing Primary and secondary connection scheme are shown o...

Страница 12: ...s taken in the factory are important as so the measurements during commissioning of each transformer The comparison between test results measured at the field allows following the evolution of each pa...

Страница 13: ...tion and thereafter at four year intervals depending on availability of the 1 Ratio TTR 2 Polarity Polarity meter 3 Saturation Voltage ac voltage source Voltmeter and Ammeter 4 Ohm Resistance Wheatsto...

Страница 14: ...ndfill properly licensed Other materials Industrial landfill properly licensed The disposal of oil and components contaminated with oil directly into the soil or water is prohibited For further inform...