
7
36
″
COOKTOPS/DOWNDRAFT UNITS
JVB96
Figure 2
Overall Cutout Dimensions
;
;;
;;
;
Figure 3
Cutout for Vent
;
;
;
Figure 1
Overall Cooktop Dimensions
1
2
3
NOTE: AGAINST-THE-WALL INSTALLATIONS ARE LIMITED DUE TO DIMENSION REQUIREMENTS.
REFER TO DETAILS BELOW.
PLANNING INSTALLATION (Note: 26
″
deep cabinets required)
PREPARING CUTOUT
A
B
C
B&C
D
I
E
F
G
H
(Figure 1) (Figure 1) (Figure 1)
(Figure 1)
(Figure 3)
(Figure 2)
(Figure 2) (Figure 2)
(Figure 3)
(Figure 3)
Min. Setback—
Downdraft
Cooktop
Cooktop
Depth
Front Edge
Min. Req’d.
Cooktop
Cooktop
Add’l Depth
Cutout Width
Overall
Overall
Vent
Cktop +
Cntrtop to Front
Inside Cabinet
Cutout
Cutout
Req’d for
Req’d from
Model No.
Width
Depth
Depth*
D.D. Vent
Edge of Cutout**
Clearance
Width
Depth
Downdraft
Centerline
JP626
35
1
⁄
2
″
21
″
2
1
⁄
8
″
23
1
⁄
8
″
2
1
⁄
2
″
22
11
⁄
16
″
33
7
⁄
8
″
19
1
⁄
8
″
2
7
⁄
8
″
33
1
⁄
16
″
JP960
36
″
20
3
⁄
8
″
2
1
⁄
8
″
22
1
⁄
2
″
2
1
⁄
2
″
22
11
⁄
16
″
33
7
⁄
8
″
19
1
⁄
8
″
2
1
⁄
2
″
33
1
⁄
16
″
JP968
JP960S
JP968S
36
1
⁄
8
″
21
″
2
1
⁄
8
″
23
1
⁄
8
″
2
1
⁄
2
″
22
11
⁄
16
″
33
7
⁄
8
″
19
1
⁄
8
″
2
5
⁄
8
″
33
1
⁄
16
″
JGP628
JGP963
36
″
21
″
2
1
⁄
8
″
23
1
⁄
8
″
2
1
⁄
2
″
22
11
⁄
16
″
33
7
⁄
8
″
19
1
⁄
8
″
2
7
⁄
8
″
33
1
⁄
16
″
JGP963S
JGP636
36
″
21
″
2
1
⁄
8
″
23
1
⁄
8
″
2
1
⁄
2
″
22
11
⁄
16
″
33
7
⁄
8
″
19
1
⁄
8
″
2
7
⁄
8
″
33
1
⁄
16
″
JGP960S
36
″
21
1
⁄
4
″
2
1
⁄
8
″
23
3
⁄
8
″
2
1
⁄
2
″
22
11
⁄
16
″
33
7
⁄
8
″
19
1
⁄
8
″
2
7
⁄
8
″
33
1
⁄
16
″
JGP962
36
″
20
7
⁄
16
″
2
1
⁄
8
″
22
9
⁄
16
″
2
1
⁄
2
″
22
11
⁄
16
″
33
7
⁄
8
″
19
1
⁄
8
″
2
5
⁄
8
″
33
1
⁄
16
″
JGP962S
36
″
21
″
2
1
⁄
8
″
23
3
⁄
16
″
2
1
⁄
2
″
22
11
⁄
16
″
33
7
⁄
8
″
19
1
⁄
8
″
2
3
⁄
4
″
33
1
⁄
16
″
*Includes 1/8
″
gap between cooktop and vent trim.
**Required to maintain UL or AGA approvals.