GE JK3800DH4BB Скачать руководство пользователя страница 8

12

 OVEN RACK GUIDE INSTALLATION (IF APPLICABLE)

A.  Locate included oven rack guide mounting hardware.
B.  Place oven rack guides on cavity wall studs with L bracket towards back of cavity as shown.
C.  Install guides using the 8 provided mounting nuts.
D. See Owner’s Manual for detailed rack installation and different rack configuration.

14

 FINAL INSTALLATION CHECKLIST

•  Check to make sure the circuit breaker is closed (RESET) or the circuit fuses are replaced.
•  Be sure power is in service to the building.
•  Check that all packing material and tape have been removed. Failure to remove these materials 

could result in damage to the appliance once the appliance has been turned on and surfaces have 

heated.

•  Remove all items from inside the oven.
•  Check to be sure that the mounting screws are installed and flush with the side trim  

(see Section 10).

•  Check that the bottom trim is installed properly (see Section 11).
•  Ensure that air duct opening at bottom of unit is free of obstructions.
•  Check that oven rack guides (if applicable) are installed correctly and oven racks function smoothly.

OPERATION CHECKLIST

•  Turn on the power to the oven (refer to your Owner’s Manual). Verify that the bake and broil units and 

all cooking functions operate properly.

•  See your Owner’s Manual for the troubleshooting list.
•  Be sure all of the oven controls are OFF before leaving the oven.

Oven rack 

guide shown 

in place.

13

 REPLACING THE OVEN DOOR

NOTE: The oven door is heavy. You may need help lifting the door high enough 

to slide it into the hinge slots. Do not lift the door by the handle.

A. Lift the oven door by grasping each side.
B. With the door at the same angle as the removal position (approximately 

1”–2” [2.5 cm–5.1 cm] from the closed position), seat the notch of the hinge 

arm into the bottom edge of the hinge slot. The notch of the hinge arm must 

be fully seated into the bottom of the slot.

C. Fully open the door. If the door will not fully open, the indentation is not 

seated correctly in the bottom edge of the slot.

D.  Push the hinge locks up against the front frame of the oven cavity,  

to the locked position.

E. Replace hinge bracket. The hinge bracket must be replaced for proper door 

functionality.

F.  Close the oven door.

Hinge in 

Locked 

Position

Notch of Hinge 

Securely Fitted 

Into Bottom of 

Hinge Slot

Bottom 

Edge of 

Slot

Hinge 

Arm

Hinge Notch

Hinge Bracket

Содержание JK3800DH4BB

Страница 1: ...nce Remove all packing parts from oven racks and heating elements Remove protective film and labels on the outer door and control panel Also remove plastic on trims and panel all tape around the oven and any shipping screws securing the oven to the base pad Open oven door and remove literature pack and oven racks Remove the bottom trim from the top of the oven It will be installed at the end of th...

Страница 2: ...nly right side only 2 B CUTOUT FOR SINGLE OVENS UNDER COUNTER NOTE These ovens are only approved to be installed under the specific models as labeled on the unit Dimension Dimension Description 27 Single Oven 30 Single Oven A Cabinet Width 25 63 5 cm min 281 ø2 72 4 cm min 251 ø4 64 1 cm max 285 ø8 72 7 cm max B Cutout Height 275 ø8 70 2 cm min 271 ø4 69 2 cm min 281 ø8 71 4 cm max 275 ø16 69 4 cm...

Страница 3: ... max right side only J Height to Bottom of Junction Box 44 111 8 cm 47 119 4 cm 47 119 4 cm K Recommended Cutout Location from Floor 131 ø4 33 7 cm 12 30 5 cm 12 30 5 cm 2 D CUTOUT FOR DOUBLE OVENS with Upper Microwave Oven NOTE If the cabinet does not have a front frame and the sides are less than 1 9 cm thick shim both sides equally to establish the cutout width Continue to Section 3 for DWO wit...

Страница 4: ...equirement Continue to Section 4 3 PEDESTAL RAIL INSTALLATION 30 DOUBLE OVENS ONLY A Place one pedestal rail on each cabinet runner or centered on opposite side of solid cabinet bottom flush with side of cabinet opening Locate each rail so that front of rail is behind front cabinet opening B Drill pilot holes and attach rails to runner or bottom of cabinet with provided hardware 6 375 27 5 1 5 3 0...

Страница 5: ...e are no local codes your oven must be wired and fused to meet the National Electrical Code NFPA No 70 latest edition available from the National Fire Protection Association 5 ELECTRICAL REQUIREMENTS CONT This appliance must be supplied with the proper voltage and frequency and connected to an individual properly grounded branch circuit protected by a circuit breaker or fuse See the rating plate l...

Страница 6: ... it sits above left side of the lower oven as view from the front D When you are sure the conduit is out of the way slide the oven way back into the opening Remove the string by pulling on one end of the loop Pull Out on String Loop While Pushing the Oven Into the Cabinet 7 THREE CONDUCTOR BRANCH CIRCUIT CONNECTION NOTE If residence leads are aluminum conductors see WARNING in Section 5 Electrical...

Страница 7: ...ot holes make sure the oven is pushed as far back into the opening as it will go and is centered NOTE If the cabinet is particle board you must use 8 x particle board screws These may be purchased at any hardware store A Drill through the mounting holes top and bottom of the side trim for the 8 mounting screws provided B Secure the oven cabinet with the screws provided Mounting Hole Locations hole...

Страница 8: ...oothly OPERATION CHECKLIST Turn on the power to the oven refer to your Owner s Manual Verify that the bake and broil units and all cooking functions operate properly See your Owner s Manual for the troubleshooting list Be sure all of the oven controls are OFF before leaving the oven Oven rack guide shown in place 13 REPLACING THE OVEN DOOR NOTE The oven door is heavy You may need help lifting the ...

Страница 9: ... puede provocar daños al electrodoméstico Quite todas las partes de empaque del horno bandejas y elementos de calentamiento Quite la película protectora y las etiquetas de la puerta exterior y panel de control También quite los elementos plásticos de los rebordes y panel toda la cinta que cubre el horno y los tornillos de envío que fijan el horno a la almohadilla base Abra la puerta del horno y qu...

Страница 10: ...la abertura H Ubicación de la caja 83 ø4 22 2 cm máx 91 ø2 24 1 cm máx de conexiones sólo lado derecho sólo lado derecho Dimensión Descripción de la dimensión Horno único de 27 Horno único de 30 A Ancho del gabinete 25 63 5 cm mín 281 ø2 72 4 cm mín 251 ø4 64 1 cm máx 285 ø8 72 7 cm máx B Altura de la abertura 275 ø8 70 2 cm mín 271 ø4 69 2 cm mín 281 ø8 71 4 cm máx 275 ø16 69 4 cm máx C Superposi...

Страница 11: ...ión de la parte inferior del horno de la abertura 1 2 5 cm min 11 ø4 3 2 cm 11 ø4 3 2 cm H Ubicación de la caja de conexiones 83 ø4 22 2 cm max sólo lado derecho 91 ø2 24 1 cm max sólo lado derecho 91 ø2 24 1 cm max sólo lado derecho J Altura hasta la parte inferior de la caja de conexiones 44 111 8 cm 47 119 4 cm 47 119 4 cm K Ubicación recomendada de la abertura desde el piso 131 ø4 33 7 cm 12 3...

Страница 12: ...o mínimo Si el gabinete se encuentra en la condición de ancho máximo agregue cuñas de madera para llevar el gabinete a la condición de ancho mínimo Requisitos para el gabinete de 30 No se requiere el uso de cuñas o tacos cuando el gabinete se encuentre en la condición de ancho mínimo Si el gabinete se encuentra en la condición de ancho máximo repare los tacos de madera como se muestra en la ilustr...

Страница 13: ... provocar una situación peligrosa Si no existen códigos locales el cableado y fusibles de su horno deben cumplir con el Código Eléctrico Nacional NFPA Nº 70 última edición disponible en National Fire Protection Association Asociación Nacional de Protección contra Incendios 5 REQUISITOS ELÉCTRICOS CONT Este aparato debe recibir el voltaje y frecuencia adecuados y debe conectarse a un circuito deriv...

Страница 14: ... como se ve desde el frente D Cuando se asegure de que el conducto no esté en el camino deslice el horno hacia atrás dentro de la abertura Quite el hilo jalando de un extremo del lazo Jale del lazo de hilo mientras empuja el horno dentro del gabinete 7 CONEXIÓN DE CIRCUITO DERIVADO DE TRES CONDUCTORES NOTA Si los cables del hogar poseen conductores de aluminio ver la ADVERTENCIA de la sección 5 Re...

Страница 15: ...rese de que el horno se encuentre en la posición final de la abertura y centrado NOTA Si el gabinete es de placa de partículas deben utilizarse tornillos 8 x para dicho material Éstos pueden adquirirse en cualquier ferretería A Perfore a través de los orificios de montaje superiores e inferiores del reborde lateral para los tornillos de montaje 8 provistos B Asegure el gabinete del horno con los t...

Страница 16: ...rno incluida B Posicione el conducto de modo tal que se apoye detrás de la unidad en un círculo natural cuando el horno sea instalado C Instale las guías usando las 8 tuercas de montaje provistas D Para una instalación de estantes detallada y una configuración de estantes diferente consulte el Manual del Propietario Imagen de la guía de la estantería en su lugar correspondiente 13 CÓMO VOLVER A CO...

Отзывы: