background image

11

Final Check List

Operation Check List

Check to make sure the circuit breaker is closed (Reset) or the circuit fuses are replaced.
Be sure power is in service to the building.
Check to be sure that all packing materials and tape on metal panel (if applicable) under
control knobs have been removed.

Check to make sure the Clock display is energized. If a series of horizontal red lines appear
in the display, disconnect power immediately. Recheck the range wiring connections. If
change is made to connections, retest again. If no change is required, have building wiring
checked for proper connections and voltage. It is recommended that the clock be changed if
the red lines appear.
Push in and turn any one of the four surface knobs to “MED” setting to observe that the
element glows within 60 seconds. Turn the knob off when glow is detected. If the glow is not
detected within the time limit, recheck the range wiring connections. If change is required,
retest again. If no change is required, have building wiring checked for proper connections
and voltage.

Installation Instructions

E

F

Содержание JBP10

Страница 1: ...30 JBP35 JBP48 JBP64 JBP66 JBP68 JBP69 JBP71 JBP78 JBP80 JBP82 JBP90 JBP91 JBP95 JB500 JB600 JB700 JB800 NOTE TO INSTALLER Be sure to leave these instructions with the consumer OWNER Keep these instru...

Страница 2: ...nstalled and grounded by a qualified technician Make sure the cabinets and wall coverings around the range can withstand the temperatures up to 200 F generated by the range WARNING For personal safety...

Страница 3: ...OWNER Keep these instructions for future reference Note This appliance must be properly grounded if applicable Before you begin Read these instructions completely and carefully IMPORTANT Save these i...

Страница 4: ...range can with stand the heat up to 200 F generated by the range Allow 30 Minimum clearance between surface units and bottom of unprotected wood or metal cabinet and 15 Minimum between countertop and...

Страница 5: ...ve January 1 1996 the National Electrical Code requires that new but not existing construction utilize a 4 conductor connection to an electric range When installing an electric range in new constructi...

Страница 6: ...ound Screw and Ground Strap Location Strain Relief Clamp Connection Plate Knockout in center of connection plate may be taken out B8 Attach the green lead below the junction block with the ground scre...

Страница 7: ...al Do not remove the ground strap Push the cord upward to relieve strain while tightening the strain relief clamp B9a Re install the wire cover with the 5 screws removed earlier Make sure the wires do...

Страница 8: ...ecide whether the bracket will be installed on the right or left side of range location b If the bracket side of the range has an adjacent cabinet place the bracket against the back wall and cabinet a...

Страница 9: ...range must be level for proper cooking and baking Use an adjustable wrench to adjust all four leg levelers until the range is level Continued on following page D9 Pick the Oven Door up by placing both...

Страница 10: ...and or the rail is in the guide IF DRAWER IS CROOKED Lower the front of the drawer and push in until it closes Remove and replace making sure the rail is in the guide SPECIAL INSTRUCTIONS IF YOU HAVE...

Страница 11: ...eck the range wiring connections If change is made to connections retest again If no change is required have building wiring checked for proper connections and voltage It is recommended that the clock...

Страница 12: ...12 NOTES Pub No 31 10513 229C4053P493...

Отзывы: