background image

Skill Level:

  High    

Average 

    Low

Completion Time:

 1 to 3 Hours

Proper installation is the responsibility of the installer. Product failure due to improper installation
is not covered under the GE Appliance Warranty. See the Owners Manual for warranty
information.

CAUTION: Before you begin

Read these instructions carefully and

completely.
• IMPORTANT- Save these instructions for

local inspector’s use.

• IMPORTANT- Observe all governing codes

and ordinances.

Self Cleaning Free-Standing

Electric Range

Installation

Instructions

EER2000, EER3000, EER3001, EER3002, JBP10, JBP24, JBP26, JBP30,
JBP35, JBP48, JBP64, JBP66, JBP68, JBP69, JBP71, JBP78, JBP80,
JBP82, JBP90, JBP91, JBP95, JB500, JB600, JB700, JB800

• NOTE TO INSTALLER- Be sure to leave

these instructions with the consumer.

• OWNER- Keep these instructions for future

reference.

• WARNING- This appliance must be

properly grounded.

Parts Included

Tools You Will Need

Pub. No. 31-10513
229C

4053P493

1

“If you have questions, Call 800-GE-CARES 

or visit our website at:

www.GEAppliances.com”

1/4”Nut

driver

Adjustable wrench

Pencil

Materials Needed

Lag Bolts Anchor Sleeves

4- Wire Cord
4’long

3 -Wire Cord

4’long

(For Concrete Floors Only)

( UL Approved 40 AMP)

OR

;

;

;

y

y

y

Drill with

1/8” Bit

Anti-Tip Bracket and leg leveler

Safety

Glasses

Tape Measure

Level

5/16” Hex Head

Nut driver

Phillips

Screwdriver

Flat-Bladed

Screwdriver

1

2

3

4

Содержание JBP10

Страница 1: ...30 JBP35 JBP48 JBP64 JBP66 JBP68 JBP69 JBP71 JBP78 JBP80 JBP82 JBP90 JBP91 JBP95 JB500 JB600 JB700 JB800 NOTE TO INSTALLER Be sure to leave these instructions with the consumer OWNER Keep these instru...

Страница 2: ...nstalled and grounded by a qualified technician Make sure the cabinets and wall coverings around the range can withstand the temperatures up to 200 F generated by the range WARNING For personal safety...

Страница 3: ...OWNER Keep these instructions for future reference Note This appliance must be properly grounded if applicable Before you begin Read these instructions completely and carefully IMPORTANT Save these i...

Страница 4: ...range can with stand the heat up to 200 F generated by the range Allow 30 Minimum clearance between surface units and bottom of unprotected wood or metal cabinet and 15 Minimum between countertop and...

Страница 5: ...ve January 1 1996 the National Electrical Code requires that new but not existing construction utilize a 4 conductor connection to an electric range When installing an electric range in new constructi...

Страница 6: ...ound Screw and Ground Strap Location Strain Relief Clamp Connection Plate Knockout in center of connection plate may be taken out B8 Attach the green lead below the junction block with the ground scre...

Страница 7: ...al Do not remove the ground strap Push the cord upward to relieve strain while tightening the strain relief clamp B9a Re install the wire cover with the 5 screws removed earlier Make sure the wires do...

Страница 8: ...ecide whether the bracket will be installed on the right or left side of range location b If the bracket side of the range has an adjacent cabinet place the bracket against the back wall and cabinet a...

Страница 9: ...range must be level for proper cooking and baking Use an adjustable wrench to adjust all four leg levelers until the range is level Continued on following page D9 Pick the Oven Door up by placing both...

Страница 10: ...and or the rail is in the guide IF DRAWER IS CROOKED Lower the front of the drawer and push in until it closes Remove and replace making sure the rail is in the guide SPECIAL INSTRUCTIONS IF YOU HAVE...

Страница 11: ...eck the range wiring connections If change is made to connections retest again If no change is required have building wiring checked for proper connections and voltage It is recommended that the clock...

Страница 12: ...12 NOTES Pub No 31 10513 229C4053P493...

Отзывы: