•
Base plate assembly (mandatory) 2285048 – Refer to
•
If there is no integrated baseplate plan (2359194) delivered with S18101SG, please refer to
drawings 2359194 (Angio configuration
) or 2359194 (Cardio configuration
). Please order locally the integrated base plate based on this plan.
•
Assembly and separation (Select kit) 2285050 – Refer to tables,
○
Above grade, Floor anchors without insert – 2285051.
○
Through bolts without insert – 2285646.
○
On grade, Floor anchors – 2286398.
○
Above grade, Floor anchors and insert – 2285052.
○
Through bolts and insert – 2285053.
○
Floor plate / Base plate Assembly – 2285632.
•
Templates (select kit) – 2285054 – Refer to
Angio/Cardio/Neuro templates – 2285056 (containing 2185979, 2127792 and 2360133
templates).
1.1 2285048 - Base Plate Assembly
Table 2-1:
Item
Name
Part #
Description
Quan.
Notes
Baseplate
2285059
12 Hole Floor Baseplate
1 pc
Lift Plate
2290939
Lifting Straps
2 pc
Hex Head
Screw
5166535
Hex Head Screw 1/2”-13UNC L1
1/2” 12.9 Black
2 pc
Grease
2295599
Lithium grease lubricant 100g
2 pc
Doc
2230112-1-100
Vascular Gantry Baseplate and Ta‐
ble
1 pc
Doc
2229297-100
LCA/LCV+/LC+ System Baseplate
and Omega IV/V/EP Table Floor
Preparation
1 pc
Doc
2290880-2-100
Innova Pre-Installation Kit Install
Procedure
1 pc
NOTE:
The 12 Gantry baseplate mounting screws are delivered with the system's Gantry. These
screws are:
•
cap screws 5166774; Screw Socket Head Cap 1/2”-20 UNF L1 1/2” 12.9 Black (used
when installing new system on old baseplate (US threads))
•
cap screws 2300939; Hex Head Cap screw; M12 40/40 Class 12.9 Black ; used to
attach L-brackets on table shipping pallet to positioner dolly for table positioning
(used when the new baseplate is metric threads)
Single Plane and Biplane Innova Systems Pre–Installation Kit Installation Procedures
GE Healthcare
Direction 2290880-12-1EN, Revision 1
40
1 LC Positioner and Table Floor Preparation Kits
Содержание Innova Series
Страница 53: ......